PAGE 3 OF 8
0713 IH-1393
NOTE: Do not tighten bolts until
unit is completely assembled.
1. Locate and separate the left and righthand sides.
Identify the top of each panel. The top of each
panel has three holes instead of one.
2. Place back (1) on a protected flat surface so that
the flanges face upward.
3. Bolt left side (2) to the back so that side flange fits
around back (use 7 bolts and nuts - nuts to the
inside). Do not use bottom two holes; these will be
used for attaching legs in step 7. (See Figure 1)
4. Next bolt top, bottom (5) and shelves (4) to back
and left side panel (use 4 bolts and nuts each).
Next bolt an intermediate side and back panel
to the flange on the back of the first locker in 7
places. Next attach a top, bottom and intermediate
top to the first intermediate side and back. These
will share bolts with the parts on either side of them
as shown in detail view. Next attach remaining
intermediate side and back to flange of second
back. Attach remaining top, bottom and shelves to
the intermediate side. (See Figure 2)
5. Bolt right side (6) to the back so that side flange
fits around back. Attach side to top, bottom and
shelves. (See Figure 3)
6. Insert legs (3) into the corner between the bottom
and the side. Bolt the leg to the side using two bolts
and nuts per leg. (See Figure 4)
7. Place door and frame assemblies (7 & 8) over the
locker body. make certain that body sides are
inside frames, not between the frames. Attach top
to frame header and the bottom to frame sill (one
bolt each). (See Figure 5)
8. Stand unit upright and place in desired location.
Remove temporary bolts in frames and bolt to any
adjacent units together through frames.
ASSEmbLy INSTrUCTIONS
1
2
Top
Bottom
Figure 1
2
6
4
5
1
6
Figure 2
Figure 3