background image

www.U-LineService.com

16

03/2008

CLR2160/CLRCO2175 Ice Makers

• Drain line does not create traps or created traps are 

vented (see 

Figure 37

).

See 

Figure 38

 for a typical Gravity Drain installation.

If using a Gravity Drain:

1. Slide 2 hose clamps onto the drain connection on the 

rear of the appliance.

2. Insert the barbed fitting halfway into this connection.

3. On the other end of this barbed fitting attach the 5/8” 

braided tubing.

4. Slide a clamp on each side of the barbed fitting as 

shown (see 

Figure 39

).

5. Insulate the drain line, if necessary to prevent 

condensation. Go on to 

Final Water/Drain Connection 

Page

 

18

.

Factory-Installed Drain Pump

If your drain line will run up to a stand pipe, disposal 
assembly or spigot assembly or does not otherwise meet 
the requirements for a Gravity Drain, you may have 
ordered the CLR2160 or CLRCO2175 with a U-Line P60 
Drain Pump. See 

Figures

 

42

43

 and 

44

 for typical 

installations requiring a Drain Pump. If you need to install 
a P60 Drain Pump into your unit, see 

Locally-Installed 

Drain Pump

 on 

Page

 

17

.

IMPORTANT

Before installing your U-Line CLR2160 or CLRCO2175 with 
Factory-Installed U-Line P60 Pump, it is extremely 
important to check and test all hose connections at the 
drain pump. There is a possibility that hose connections 
may have loosened during shipment.

To check and test hose connections:

1. Make certain the unit is not plugged into an electrical 

outlet.

Normal

Proper Drain

With Trap

Poor Drainage, Water Will Back Up

With Trap and Vent

Proper Drain

ULIN_0569_A

Figure 37

Waste

Waste

Cold

Water

Shut-Off

Valve

Hot

Water

G

r

avit

y

 D

r

ain

ULIN_0570_A

Figure 38

Drain Fitting from

Back of Unit

Worm Clamps

Drain Line

5/8" x 5/8"

Barb Connector

ULIN_S_0166b2_A

Figure 39

Summary of Contents for Echelon CLRCO2175S41

Page 1: ... 354 0300 FAX 414 354 7905 Service Parts Tech Lines Phone 800 779 2547 FAX 414 354 5696 OnlineService U Line com 2008 U Line Corporation 03 2008 CLR2160 Clear Ice Maker CLRCO2175 Combo Clear Ice Maker Refrigerator Installation Guide ...

Page 2: ...ime 23 Initial Start Up 23 Start Up Troubleshooting 24 Who to Call 24 Service Information 24 IMPORTANT PLEASE READ all instructions completely before attempting to install or operate the unit This unit requires connection to the water supply Improper hook up can result in substantial property damage If you are unsure of your ability to safely connect the water supply to the unit consult a licensed...

Page 3: ...anel or a 3 4 inch thick full overlay door panel Stainless Steel units are covered with a protective coating and have been ordered left or right hand hinged The Stainless doors are not reversible and do not accept custom panels CLR2160 Ice Makers CLRCO2175 Clear Ice Maker Refrigerators may be ordered with or without a factory installed drain pump Please carefully follow the directions that apply t...

Page 4: ...water Wipe with a soft clean towel to prevent water spotting Stainless Steel Models Stainless steel models can discolor when exposed to chlorine gas pool chemicals salt water or cleaners with bleach Keep your stainless steel unit looking new by cleaning with a good quality all in one stainless steel cleaner polish on a monthly basis For best results use Claire Stainless Steel Polish and Cleaner wh...

Page 5: ...nt cabinet doors in certain installations you may need to alter the wall just behind the drain connection on the unit to accommodate the drain The actual amount of alteration will be determined by your actual drain connection components Product Dimensions CLR2160 Please note that the unit has adjustable feet that can add one additional inch to height during leveling or to match adjacent cabinets s...

Page 6: ...ion will be determined by your actual drain connection components Product Dimensions CLRCO2175 Please note that the unit has adjustable feet that can add one additional inch to height during leveling or to match adjacent cabinets see Figure 50 on Page 21 Door Swing Clearances Information CLRCO2175 Black and White units have a zero clearance for the door to open 90 see Figure 6 Stainless Steel mode...

Page 7: ...10 4 Remove the two door closer inserts from the existing bottom hinge and install as shown on the new bottom hinge see Figure 11 5 Remove existing bottom hinge 3 screws and remount on opposite side TOP Remove hinge screw pin 6 Remove the plastic hole plug from the top of the door to allow the pivot pin to be inserted in the new location Install the plug into the vacated hole on the opposite side ...

Page 8: ...formance keep the unit out of direct sunlight and away from heat generating equipment For best performance and life outdoors place under a counter or provide shelter of some kind In climates where high humidity and dew points are present condensation may appear on outside surfaces This is considered normal The condensation will disappear when the humidity drops Side By Side Installation Instructio...

Page 9: ... with or accent the surrounding décor a Custom 1 4 Insert or a Full Overlay If no custom door panel is used go on to 5 Adjust Door Custom 1 4 Door Panel Insert Door Panel Preparation A custom door panel can be inserted into the doorframe Custom door panels can be flat or raised as long as the maximum panel thickness where inserted into the door reveal channel is 1 4 thick For raised panels the dep...

Page 10: ...ttom hinge pin and install upper hinge screw Full Overlay Door Panel Door Panel Preparation A full overlay door panel completely covers the doorframe and handle to give a built in appearance See your U Line dealer for the optional Full Overlay Door Panel Kit 2175 Models P N U OL2175B Black P N U OL2175W White 2115 CLR2160 Models P N U OL2115B Black P N U OL2115W White Appropriate hardware Modified...

Page 11: ...hillips screwdriver Remove the door by tilting forward and lifting off the bottom hinge pin 3 Pull door gasket out of the groove top edge of door only Start in the middle and pull outward moving toward the edge see Figure 21 This may take some force 4 Remove the two screws located on both sides of the handle 5 Remove the handle and discard This handle will be replaced with the Overlay Handle inclu...

Page 12: ...andle and secure with the two screws removed in Step 4 under Removing Existing Door 3 Attach Overlay cap to door opposite side of where hinges will be see Figure 27 Removed Door Panel Top of Wood Panel Back of Wood Panel Side of Wood Panel Tape 1 3 4 Top 3 8 Both Sides Figure 23 28 7 8 1 1 1 4 15 9 16 1 4 2 5 8 1 4 Drill ø 5 32 x 3 8 Deep 7 Places Model 2175 6 places Model 2115 and CLR2160 For use...

Page 13: ...ge plate IMPORTANT Pivot posts must be cleaned Closers must also be clean and greased to ensure proper operation 5 Place the modified door onto the pivot post 6 Position door and install the pivot post into the top hinge using the Phillips screwdriver 7 Adjust door as needed for proper closure 8 Check to see that light goes off when the door closes 9 Reinstall the door shelves by lining up the bos...

Page 14: ...e Figure 32 Remove door by tilting forward and lifting off bottom hinge pin 2 With door upside down loosen but do not remove the two screws on the door s bottom hinge plate 3 See Figure 33 If the top far edge of the door needs to move UP move the hinge plate toward the outside of the door and retighten screws If the top far edge of the door needs to move DOWN move the hinge plate toward the inside...

Page 15: ... 35 2 Locate the U Line supplied garden hose fitting Ensure the end of the copper tubing has been cut straight and free of burrs Slide the compression nut and ferrule onto the copper tubing as shown see Figure 36 Push the assembly completely into the the garden hose fitting and tighten using the two wrenches Wait to connect this assembly to the appliance until the drain connection is ready Drain C...

Page 16: ... requirements for a Gravity Drain you may have ordered the CLR2160 or CLRCO2175 with a U Line P60 Drain Pump See Figures 42 43 and 44 for typical installations requiring a Drain Pump If you need to install a P60 Drain Pump into your unit see Locally Installed Drain Pump on Page 17 IMPORTANT Before installing your U Line CLR2160 or CLRCO2175 with Factory Installed U Line P60 Pump it is extremely im...

Page 17: ...ump If a gravity drain connection is not possible and you have not purchased a CLR2160 or CLRCO2175 with factory installed pump we strongly recommend the use of the U Line P60 drain pump The U Line P60 drain pump is available through your Dealer with complete installation instructions If a pump other than the U Line P60 drain pump is to be used it must meet the following specifications It must be ...

Page 18: ...ge 18 Final Water Drain Connection 1 Connect the water supply fitting by screwing the brass garden hose fitting to the watervalve in the rear of the unit 2 Tighten this fitting with pliers Note Do not use Teflon tape or joint compound on this fitting The rubber washer provides an adequate seal Other materials could cause blockage of the valve Cold Water Hot Water Waste Waste Shut Off Valve Stand P...

Page 19: ...tallations use a floor drain standpipe garbage disposal or Y branch tailpiece type drain connection see Figures 42 43 and 44 10 Check to ensure unit is level both side to side and front to back See Leveling Information on Page 20 IMPORTANT For the gravity floor drain or the standpipe be sure to secure the drain line to these items to prevent it from coming loose and causing water damage IMPORTANT ...

Page 20: ...LRCO2175 to be more easily serviced with self diagnostics without disturbing your installation WARNING SHOCK HAZARD Electrical Grounding Required Never remove the round grounding prong from the plug and never use a two prong grounding adapter Never use an extension cord to connect power to the unit Go on to 8 Level the Unit Leveling Information IMPORTANT It is extremely important that the unit is ...

Page 21: ...to kink the drain or water supply line or entangle the electrical cord 5 Re check the leveling from front to back and side to side Make any necessary adjustments The unit s top surface should be approximately 1 8 below the countertop Test the drain system by pouring one gallon of water into the ice bin The water should drain freely and there should be no leakage Installation of the CLRCO2175 1 Ope...

Page 22: ...likely caused by a bad connection in the water supply line Make sure the water line s brass fitting is screwed tight to its valve and threaded correctly Make sure the fill tube s connection to the water line is also tight Check drain line to make sure it has not been disconnected from drain connection on back of the unit or disconnected from the drain Problem Q The door remains open unless it is p...

Page 23: ...rature 38 F when the unit is on and will show OFF when the unit is off The CLR2160 display see Figure 53 3 will show ICE when the unit is on and will show OFF when the unit is off 4 Watch the water flow over the evaporator assembly ice cube tray to familiarize yourself with the operation Upon initial start up water flow over the evaporator may be uneven This may cause uneven sized cubes or water s...

Page 24: ...will shut down due to the safety design of the pump if water cannot drain Problem Q Water does not appear to be flowing into unit Solution A Check that the water is connected and turned on the line is not obstructed and the overflow tube is inserted securely into water trough Problem Q The unit has been operating for 24 hours and water is still not flowing evenly over evaporator Solution A Level u...

Reviews: