PAGE 8 OF 38
1021 IH-5759
3. Place shelf (3) on brackets. Install to brackets with
four 5/8" bolts and flange nuts. (See Figure 17)
PEGBOARD AND LOUVERED PANEL
ASSEMBLY
1. Position panel mounting bars (6) at desired height
on the uprights. There should be 8 open holes on the
upright between the top and bottom bar to allow for
panel mounting. Secure bars to upright with four 1⁄"
bolts. (See Figure 18)
NOTE: The holes on the face of the mounting
bars should be facing the inside direction.
2. Attach panel brackets (7) to pegboard panel (4) or
louvered panel (5). Line up holes on bracket with the
four holes on the ends of the panels. Attach four 5/8"
bolts and flange nuts on the center holes only.
(See Figure 19)
3. Install panels (4 and/or 5) to the mounting bars (6).
Line up holes on the top and bottom of the panel
with the holes in the bar. Secure using four 1
⁄
" bolts
and flange nuts. (See Figure 20)
4. Repeat for additional panels. The 48" workstation
holds up to 2 panels, 60" and 72" workstations hold
up to 3 panels, and the 96" workstation holds up to
4 panels.
5. Assembly is complete. (See Figure 21)
OPTIONAL ACCESSORIES CONTINUED
Figure 17
Figure 18
Figure 21
Completed Assembly
5/8" Bolts
Shelf
Flange Nuts
1½
"
Bolts
Panel Mounting Bars
Figure 19
Panel Bracket
Panel
Figure 20
1½"
Bolt
Flange Nut