USER GUIDE
Integrated Panel Installation 1
u-line.com
SAFETY •
INSTALLATION & INTEGRATION
• OPERATING INSTRUCTIONS • MAINTENANCE • SERVICE
Integrated Panel Installation
1. Fully open drawer.
2. Align top of panel with top edge of drawer. Center
panel on drawer.
NOTICE
Due to differences in floor construction or
surrounding cabinetry, the panel may not sit
flush with the top of the drawer.
3. Secure integrated
panel to drawer
using clamps. A
robust tape may
also be used. U-
Line recommends
the use of bar
clamps to secure
the panel to the
drawer. If using
tape, be certain the
tape will not
damage panel finish
upon removal.
4. Using a 7/64"
(3 mm) drill bit, drill
6 pilot holes into
the wood panel 1/2"
(12 mm) deep using
the holes in the drawer frame as a guide.
NOTICE
It is important to ensure that all drilled holes are
drilled to the correct depth in order to avoid
splits in the wood when hardwood is installed.
5. Locate 12 of the #6x 1-1/2" (38 mm) screws provided
with your unit.
6. Using a Phillips screwdriver, place one screw into each
of the 6 pilot holes and screw down. Do not overtighten
screws.
7. Remove clamps from drawer.
NOTICE
If panel requires additional adjustment after
removing clamps, slightly loosen each screw and
adjust panel as necessary. Tighten screws upon
completion.
Wood
Panel
Door/Drawer
Bar
Clamp
Bar
Clamp
Integrated Panel
Integrated Panel