2
WARNING: 60A MPPT Controller is Positive Ground. Do
Not Connect Battery Minus to Chassis Ground.
Batter-
ies should be floating. OK to connect controller ground
screw to chassis ground.
Qwik Install
STEP 1:
Prepare a foundation to provide level support for the enclo-
sure.
STEP 2:
Place enclosure on the foundation. Install 4 or 8 batteries in
the box.
Batteries are heavy. Be sure to have a helper
. Connect all
batteries in series configuration for either 24VDC or 48VDC (See Wiring
Diagram Below)
Summary of Contents for UPSPro UPAL24/48-900
Page 8: ...8 ...