background image

TFP1100

Page 8 of 16

External Trim Connections

C1

C2

C3

C4

C5

C6

C7

C8

Diaphragm Supply Connection

Water Motor Alarm Connection

Air Supply Connection

Waterflow Pressure Alarm Switch 

Connection

Low Air Pressure Switch  

Connection

Main Drain Connection

Drip Funnel Drain Connection

Fire Detection System  

Connection

Item

Description

A

B

C

D

E

F

G

H

J

K

L

DV-5

a

 Valve

System Main Control Valve

Waterflow Pressure Switch

Main Drain Valve

System Drain Valve

Automatic Drain Valve

Alarm Test Valve

Alarm Control Valve (Optional)

Water Supply Gauge

Diaphragm Gauge

System Gauge

Item

Description

M

N

P

Q

R

S

T

U

V

W

X

Manual Control Station

Manual Reset Actuator

Diaphragm Supply Valve

Diaphragm Supply Strainer

Water Supply Shut-Off 

Air Supply Valve

Air Pressure Relief Valve

Not Used

Solenoid Valve

Not Used

System Shut-Off Valve

QRS Equipment 

Q1

Q2

Q3

QRS Switch

Releasing Panel

Battery Back-Up

LOCATION

FOR OPTIONAL

ELECTRICALLY

SUPERVISED

N.O. ALARM

CONTROL

VALVE

C6

C7

C5

C3

C2

C4

C1

C8

Q1

Q2

Q3

A

B

J

K

D

E

F

G

M

N

P

Q

V

X

S

L

T

C

H

R

P1

P6

P7

P2

P3

P4

P5

FIGURE 3B 

DV-5

a

 VALVE - DOUBLE INTERLOCK PREACTION ELECTRIC/ELECTRIC ACUATION TRIM 

WITH MODEL QRS ELECTRONIC ACCELERATOR OPTIONAL COMPONENTS 

OPERATIONAL COMPONENTS

Notes:

•  Port Connections P1 through P7 are described in Technical Data Sheet TFP1450, Figure 2.

Summary of Contents for QRS

Page 1: ...e from the automatic control valve deluge valve to permit the automatic control valve deluge valve to open The Model QRS Electronic Accelera tor automatically adjusts to both small and slow changes in...

Page 2: ...ion Step 1 The QRS Electronic Accelera tor Riser Components P N 52 312 2001 must be installed per Figure 2 or 8 as applicable The DV 5A Double Interlock Preaction Trim with Electric Electric Actuation...

Page 3: ...79 65 4 48 70 4 83 MODEL DPV 1 DRY PIPE VALVE WITH TRIM 4 INCH DN100 SOLENOID VALVE NORMALLY CLOSED UNTIL ENERGIZED 24 VDC P N 52 287 1 024 MODEL PFC 4410 RC RELEASING PANEL P N 20135 WITH MODEL BT 1...

Page 4: ...stem operation is based on the electric detec tion system operating before a first sprinkler operation 4 The minimum system air pressure must be the greater of that required for the dry pipe preaction...

Page 5: ...DN80 6 INCH DN150 4 INCH DN100 6 7 ACCELERATOR TRIM CONNECTION TO INTERMEDIATE CHAMBER 1 2 NPT 3 4 2 10 7 6 3 QUICK RELEASE SWITCH ACCELERATOR TRIM CONNECTION TO AIR SUPPLY PORT 1 2 NPT 9 5 8 5 1 6 7...

Page 6: ...3 922111003 922111003 16 1 DRIP FUNNEL 923431007 923431007 923431007 923431007 923431007 923431007 17 2 COMP FITTING 90 1 2 MNPT x 1 2 OD TUBE 1001253 01 1001253 01 1001253 01 1001253 01 1001253 01 10...

Page 7: ...000640 535000660 535000680 48 1 TUBING ASSY ALARM TEST INTERCONNECT 535000320 535000320 535000330 535000340 535000360 535000380 49 1 TUBING ASSY SYSTEM DRAIN 535000420 535000420 535000430 535000440 53...

Page 8: ...e System Gauge Item Description M N P Q R S T U V W X Manual Control Station Manual Reset Actuator Diaphragm Supply Valve Diaphragm Supply Strainer Water Supply Shut Off Air Supply Valve Air Pressure...

Page 9: ...NCH DN65 DN80 VALVES 4 INCH DN100 VALVE 6 INCH DN150 VALVE 7 5 16 185 7 mm 19 5 16 490 5 mm 6 3 8 161 9 mm 20 508 0 mm 5 7 16 138 1 mm 21 7 16 544 5 mm FIGURE 4A MODEL DPV 1 DRY PIPE VALVE INSTALLATIO...

Page 10: ...3 0 76 12 2 310 13 1 333 16 5 419 21 0 533 5 1 129 16 8 427 4 5 114 4 3 109 6 150 4 5 114 13 6 345 15 0 381 18 4 467 24 8 630 3 4 86 22 4 569 5 9 150 5 7 145 8 200 5 3 135 16 3 414 17 2 437 19 5 495...

Page 11: ...INSTALL AT PART 3005012 DIODE ASS Y END OF LINE RELEASING SOLENOID 5 1K LOCATION SOLENOID INSTALL AT PART 3005012 DIODE ASS Y END OF LINE RELEASING SOLENOID 5 1K LOCATION SOLENOID INSTALL AT PART 300...

Page 12: ...ZONE 1 SUPERVISORY ABORT BROWN BLUE YELLOW ORANGE VIOLET GREEN BLACK RED EOLR ALARM AIR LOW TAMPER 24VDC JUMPER JUMPER HIGH GREEN BROWN RED BLACK BLUE VIOLET RELEASING SOLENOID 5 1K LOCATION SOLENOID...

Page 13: ...drain valve The blow down proce dure that will assure complete drain ing of the system will be more easily ac complished with 10 psi air pressure in the system Step 6 When the system reaches the inten...

Page 14: ...elerator test procedure be per formed quarterly Step 1 When operation of the dry pipe preaction valve is not intended during the Accelerator trip test close the sys tem s Main Control Valve and open t...

Page 15: ...ded Field fabrication of additional materials will be Some items provided with the Model QRS Trim P N 52 312 2 001 are not used for the 2 Installation notes are typical of all Dry Pipe Valve models sh...

Page 16: ...ctric Actuation Trim When ordering Model QRS Quick Release Switch equipment for use with the DV 5a Valve Double Interlock Pre action Electric Electric Actuation Trim the QRS equipment and DV 5a Valve...

Reviews: