7.3 99Ah (6 x 33Ah BATTERIES)
Connection Procedure
1.
The batteries are placed on their ends, with the terminals facing to the left or right as
appropriate. Place the batteries in sequence, as they are wired, as follows –
2.
Connect to B1 +ve
•
one end of a red wire (LM0377), and
•
a red inter-cabinet wire (LM0380) if required.
3.
Connect the black end of a red/black wire (LM0379) to B1 –ve. Place B1 in the
cabinet in the position/orientation shown in the diagram below.
4.
Connect to B2 –ve
•
one end of a black wire (LM0378), and
•
a black inter-cabinet wire (LM0381) if required.
5.
Place B2 in the cabinet.
6.
Connect to B2 +ve
•
the free (red) end of the red/black wire that connects to B1 –ve.
7.
Move B1 and B2 against the cabinet RHS.
8.
Connect to B3 +ve
•
one end of another red wire (LM0377), and
•
the PSU red wire.
9.
Connect the black end of a red/black wire (LM0379) to B3 –ve. Place B3 in the
cabinet.
10.
Connect to B4 –ve
•
another black wire (LM0378), and
•
the PSU black wire.
11.
Place B4 in the cabinet .
12.
Connect to B4 +ve
•
the free (red) end of the red/black wire that connects to B3 –ve.
13.
Move B3 and B4 against the cabinet LHS.
14.
Connect the black end of another red/black wire (LM0379) to B5 –ve. Place B5 in the
cabinet.
15.
Connect to B5 +ve
•
the free end of the red wire that connects to B1 +ve, and
•
the free end of the red wire that connects to B3 +ve.
16.
Place B6 in the cabinet.
17.
Connect to B6 +ve
•
the free (red) end of the red/black wire that connects to B5 –ve.
18.
Connect to B6 –ve
•
the free end of the black wire that connects to B2 –ve, and
•
the free end of the black wire that connects to B4 –ve.