Tyco QE90 Installing/Wiring Manual Download Page 1

 

 

 
 
 

 

QE90 

BATTERY INSTALLATION / WIRING 

GUIDE

 

 
 
 
 
 
 

DOCUMENT: LT0437 

 
 
 

 

ISSUE 1.00; 18 April 2007 

 
 

The Vigilant QE90 EWIS is a product of 

 

Tyco Safety Products 

17 Mary Muller Drive 

Hillsborough 

Christchurch 8022 

NEW ZEALAND 

Phone : (+64 3) 389-5096 

Fax : (+64 3) 389-5938 

 
 
 
 
 
 

NOTICE

 

 
Information contained in this document is copyright, and shall not be reproduced in any form 
whatsoever, or its contents disclosed to any third party, without the written consent of Tyco Safety 
Products (The Company). Information contained in this document is believed to be accurate and 
reliable, however the company reserves the right to change the content without prior notice. 

 

COPYRIGHT (C) 2007 

TYCO SAFETY PRODUCTS 

Summary of Contents for QE90

Page 1: ...3 389 5938 NOTICE Information contained in this document is copyright and shall not be reproduced in any form whatsoever or its contents disclosed to any third party without the written consent of Ty...

Page 2: ...ROD 1 00 ORIGINAL 18 4 07 TABLE OF CONTENTS 1 PROCEDURE 3 2 SAFETY NOTICE 3 3 OVERVIEW 4 4 BATTERIES 4 5 KITS 5 6 INTER CABINET WIRING 6 7 TYPICAL BATTERY WIRING ARRANGEMENTS 7 7 1 40Ah 2 x 40Ah BATTE...

Page 3: ...he voltage of the unswitched 24V output from the power supply Check the voltage on pin 3 of the ECP power connector is in the range 18V to 27V relative to pin 4 on the same connector Note pin 4 is the...

Page 4: ...ES These procedures utilise the following sealed lead acid batteries Capacity Size L W H mm Australia Part number New Zealand part number examples 12V 33Ah 195 130 180 Tyco PS12330 CSB GP12340 Intek 1...

Page 5: ...correct quantities for connecting the recommended battery configuration as specified by QECOST KT0500 KIT IN CABINET M6 BATTERY LINK KIT consisting of KT0499 KIT M5 M6 BATTERY TERMINAL HARDWARE KIT 1...

Page 6: ...ed to be wired in parallel You will need to make matching holes in the sides of the cabinets so that the required wires can be passed out of the right side of one cabinet and into the left side of the...

Page 7: ...net and for convenience these numbers are referred to in the procedures For example B1 ve refers to the positive terminal on battery number 1 7 1 40Ah 2 x 40Ah BATTERIES Connection Procedure 1 Place B...

Page 8: ...TYCO SAFETY PRODUCTS QE90 BATTERY INSTALLATION WIRING GUIDE Version 1 00 18 April 2007 Page 8 OF 20 2 40Ah Photo...

Page 9: ...M0379 between B2 ve and B4 ve 4 Connect to B3 ve one end of a red wire LM0377 and a red inter cabinet wire LM0380 if required 5 Connect to B4 ve the free end of the red wire that connects to B3 ve and...

Page 10: ...TYCO SAFETY PRODUCTS QE90 BATTERY INSTALLATION WIRING GUIDE Version 1 00 18 April 2007 Page 10 OF 20 4 40Ah Photo...

Page 11: ...red black wire that connects to B1 ve 7 Move B1 and B2 against the cabinet RHS 8 Connect to B3 ve one end of another red wire LM0377 and the PSU red wire 9 Connect the black end of a red black wire LM...

Page 12: ...20 5 3 1 6 4 2 PLAN VIEW From PSU Red Black 2 x LM0377 2 x LM0378 Back Row ve at top Front Row ve at top 3 x LM0379 Top Top Top Top Top Top Bottom Bottom Bottom Bottom Bottom Bottom Red Red Black Blac...

Page 13: ...e wired as follows 2 Connect the red end of a red black wire LM0379 to B1 ve Place B1 in the cabinet 3 Connect to B1 ve the PSU black wire and a black inter cabinet wire LM0381 if required 4 Connect t...

Page 14: ...TYCO SAFETY PRODUCTS QE90 BATTERY INSTALLATION WIRING GUIDE Version 1 00 18 April 2007 Page 14 OF 20 2 75Ah Photo...

Page 15: ...required 4 Place B2 in the cabinet on top of B1 in the same orientation as B1 5 Connect to B2 ve the free black end of the red black wire that connects to B1 ve 6 Connect the red end of a red black w...

Page 16: ...TYCO SAFETY PRODUCTS QE90 BATTERY INSTALLATION WIRING GUIDE Version 1 00 18 April 2007 Page 16 OF 20 4 75 Ah Layout...

Page 17: ...TYCO SAFETY PRODUCTS QE90 BATTERY INSTALLATION WIRING GUIDE Version 1 00 18 April 2007 Page 17 OF 20 4 75Ah Photo...

Page 18: ...o B3 ve Place B3 in the cabinet with the ve terminal to the rear 5 Connect to B1 ve a black wire LM0378 and a black inter cabinet wire LM0381 if required 6 Connect to B3 ve the free end of the black w...

Page 19: ...ion 1 00 18 April 2007 Page 19 OF 20 6 4 PLAN VIEW Top Layer From PSU Red Red 3 1 PLAN VIEW Bottom Layer Possible inter cabinet wiring Black 5 2 LM0379 LM0379 LM0379 Black Black Black Red Red Red LM03...