55
3.
Open the lock to place the 2.5” NVMe hard disk drive into the HDD tray.
4.
Lock the tray lever to secure HDD.
5.
Reinsert the HDD tray into the chassis and press the locking lever to secure
the tray. Close the front bezel.
NOTE:
When
installing a 2.5” HDD, the tray must be push to the end and then
press down the lever locking the tray. If the tray is not pushed to the end and
pull down the lever, the tray cannot be installed in the place.
Summary of Contents for B5642F65TV8E2H-2T-N
Page 1: ...1 http www tyan com FT65T B5642 Tower Server Engineer s Manual...
Page 34: ...http www tyan com 34 1 5 4 Chassis Dimensions...
Page 36: ...http www tyan com 36 1 5 6 Block Diagram S5642 Block Diagram...
Page 61: ...http www tyan com 61 2 Push the whole system in 3 Secure the mounting screw to the rack...
Page 81: ...http www tyan com 81 Power supply Unit GPU PWR Connection...
Page 82: ...http www tyan com 82...
Page 84: ...http www tyan com 84 NOTE...
Page 122: ...http www tyan com 122 3 3 9 4 3 Intel VMD Technology...
Page 151: ...http www tyan com 151...
Page 152: ...http www tyan com 152...
Page 173: ...http www tyan com 173 3 3 26 1 Firmware Image Properties Configuration...
Page 197: ...http www tyan com 197 BIOS Temp Sensor Name Explanation...
Page 198: ...http www tyan com 198...
Page 201: ...http www tyan com 201 NOTE...