http://www.tyan.com
26
2.23 Heatsink Installation Procedures
Type A: CAM LEVER (TYPE) INSTALLATION
1. After placing back plate and interface
material under motherboard place
heatsink retention frame on top of
motherboard. Align plastic retention
bracket screw hole with CPU back-plate
standoffs. Tighten screws to secure
plastic retention bracket. Repeat this
action on the other side.
DO NOT OVER TIGHTEN.
2. After tightening screws secure metal
clip to plastic retention bracket center
tab. Repeat this action on the other side
of heatsink.
3. After securing metal clip to plastic
retention bracket center tab, push down
on plastic clip to lock plastic clip to side
tab.