background image

                                                       

http://www.tyan.com

 

35

2.1.4   Installing the Memory 

 

Follow these instructions to install the memory modules onto the motherboard.   
 
1. 

Press the memory slot locking levers in the direction of the arrows as shown in 

the following illustration.     

 

2. 

Align the memory module with the slot. When inserted properly, the memory 

slot locking levers lock automatically onto the indentations at the ends of the module. 

   

 

 

Summary of Contents for GT93-B7106

Page 1: ...1 http www tyan com GT93 B7106 Service Engineer s Manual...

Page 2: ...2 http www tyan com...

Page 3: ...ing liability or warranties relating to fitness for a particular purpose or merchantability MITAC retains the right to make changes to produce descriptions and or specifications at any time without no...

Page 4: ...se limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment This equipment generates uses and can radiate radio freq...

Page 5: ...not puncture mutilate or dispose of battery in fire There will be danger of explosion if battery is incorrectly replaced Replace only with the same or equivalent type recommended by manufacturer Disp...

Page 6: ...s an overview of the product from different angles Chapter 2 Setting Up This chapter covers procedures on installing the processors memory modules hard drivers and other optional parts Chapter 3 Repla...

Page 7: ...the purpose of this pin If your outlet does not support this kind of plug contact your electrician to replace your obsolete outlet Do not place anything on the power cord Place the power cord where it...

Page 8: ...d Consult equipment documentation for specific details Caution Slide mounted equipment is not to be used as a shelf or a work space Warning This symbol indicates the presence of hazardous energy circu...

Page 9: ...register Never use the product in a wet location Equipment Chassis Do not block or cover the openings to the system Never push objects of any kind through openings in the equipment Dangerous voltages...

Page 10: ...idth and depth must allow for proper serviceability and cable management Ensure that there is adequate airflow in the rack Improper installation or restricted airflow can damage the equipment The rack...

Page 11: ...Equipment Batteries The system battery contains lithium manganese dioxide If the battery pack is not handled properly there is risk of fire and burns Do not disassemble crush puncture short external c...

Page 12: ...l components Do not use conductive tools that could bridge live parts Use gloves when you remove or replace system components they can become hot to the touch If the product sustains damage requiring...

Page 13: ...stalling Motherboard Components 31 2 1 1 Removing the Chassis Cover 31 2 1 2 Replacing the Chassis Cover 32 2 1 3 Installing the CPU and Heat sink 33 2 1 4 Installing the Memory 35 2 1 5 Installing th...

Page 14: ...s 60 3 7 2 Connector Definitions 61 3 8 Replacing the Riser Card 62 3 8 1 Riser card Feature 63 3 9 Replacing the Fan 64 3 10 Replacing the Motherboard 66 Chapter 4 Diagnostics 69 4 1 Flash Utility 69...

Page 15: ...4 bit computing high bandwidth memory design and lightning fast PCI E bus implementation The GT93 B7106 not only empowers your company in nowadays IT demand but also offers a smooth path for future ap...

Page 16: ...DD SSD front 1 2 5 Easy swap SSD rear HDD Backplane Support SATA 6Gb s Supported HDD Interface 13 SATA 6Gb s System Cooling Configuration FAN 6 4cm fans Power Supply Type RPSU Input Range AC 100 240V...

Page 17: ...tent Memory Module DCPMM only supported with specific 2nd Gen Intel Xeon Scalable Processor codename Cascade Lake Please contact Tyan Technical Support for more detail Expansion Slots PCI E 1 PCI E Ge...

Page 18: ...ge for CPU memory chipset power supply LED Over temperature warning indicator Fan PSU fail LED indicator Others Watchdog timer support Server Management Onboard Chipset Onboard Aspeed AST2500 AST2500...

Page 19: ...5 C 50 F 95 F Non operating Temp 40 C 70 C 40 F 158 F In Non operating Humidity 90 non condensing at 35 C RoHS RoHS 6 6 Compliant Yes Package Contains Barebone 1 GT93 B7106 Barebone Manual 1 Quick Ins...

Page 20: ...iler or browse to TYAN s website for service http www tyan com GT93 B7106 Box Content 1 1U barebone 12 internal HDD bays 1 internal SSD holder 2 1 1 650W power supply unit B7106G93V13HR 3 M1723G86 FPB...

Page 21: ...1 5 About the Product The following views show you the product 1 5 1 System Front View No Description 1 Power Button 2 Unit ID Button 3 Reset Button 4 Power LED green 5 HDD LED green 6 Warning LED amb...

Page 22: ...threshold alert DIMM temperature sensor PCH temperature sensor MOS temperature sensor Inlet temperature sensor NVME temperature sensor Voltage MB voltage sensor over threshold alert Fan SYS fan sensor...

Page 23: ...www tyan com 23 1 5 2 System Rear View No Description 1 PSU1 2 PSU0 3 IPMI LAN 4 USB3 0 Ports 5 VGA 6 COM Port 7 LAN2 8 LAN1 9 OCP Card Area 10 UID Button 11 Low profile PCIE x16 Slot 12 BMC Heartbeat...

Page 24: ...power Not lit Fault Ambient or Hot spot occur OTP Fan fault Input AC UV 12V output occur OVP UVP or OCP without 5Vsb Solid amber 1Gbps LAN Port Indications 1Gbps LAN Link Activity LED Scheme Left LED...

Page 25: ...ription No Description 1 2 5 3 5 SSD HDD Trays 5 Power Supply Modules 2 M1723G86 FPB pre installed 6 Riser Card Bracket M7106 L16 1F pre installed 3 System Fans 7 2 5 SSD Tray 4 M1625G93 D PDB pre ins...

Page 26: ...http www tyan com 26 1 5 5 Chassis Dimensions...

Page 27: ...http www tyan com 27 1 5 6 Board Image S7106...

Page 28: ...http www tyan com 28 1 5 7 Block Diagram...

Page 29: ...ou from accidentally damaging the internal components 2 0 3 Tools The following procedures require only a few tools including the following A cross head Phillips screwdriver A grounding strap or an an...

Page 30: ...metal chassis of the unit case or the bare metal body of any other grounded appliance Avoid touching motherboard components IC chips connectors memory modules and leads The motherboard is pre installe...

Page 31: ...how to install components on to the motherboard including CPUs memory modules and Add on cards 2 1 1 Removing the Chassis Cover Follow these instructions to remove the GT93 B7106 chassis cover 1 Loos...

Page 32: ...these instructions to replace the GT93 B7106 chassis cover 1 Place the top cover on the chassis and slide it backwards 2 Secure the top cover by tightening the thumbscrew NOTE The thumbscrews should b...

Page 33: ...inks 1 Align and install the processor on the carrier 2 Carefully flip the heatsink Then install the carrier assembly on the bottom of the heatsink and make sure the gold arrow is located in the corre...

Page 34: ...refully flip the heatsink Align the heatsink with the CPU socket by the guide pins and make sure the gold arrow is located in the correct direction Then place the heatsink onto the top of the CPU sock...

Page 35: ...odules onto the motherboard 1 Press the memory slot locking levers in the direction of the arrows as shown in the following illustration 2 Align the memory module with the slot When inserted properly...

Page 36: ...1 indicates a populated DIMM slot 2 Use paired memory installation for max performance 3 Populate the same DIMM type in each channel specifically Use the same DIMM size Use the same of ranks per DIMM...

Page 37: ...0_MC1_DIM_CH_E1 P0_MC1_DIM_CH_E0 P0_MC1_DIM_CH_F0 Dual CPU Installed CPU0 and CPU1 Quantity of memory installed 2 4 6 8 10 12 14 16 P0_MC0_DIM_CH_A0 P0_MC0_DIM_CH_B1 P0_MC0_DIM_CH_B0 P0_MC0_DIM_CH_C0...

Page 38: ...com 38 2 1 5 Installing the Expansion Card Follow these instructions to install the expansion card 1 Unlock the knob to lift up the 2 5 SSD HDD tray and the Riser Card Bracket 2 Unscrew to remove the...

Page 39: ...http www tyan com 39 3 Insert the expansion card into the riser card bracket and secure with a screw 4 Replace the Riser Card Bracket into the chassis...

Page 40: ...all the OCP Mezz LAN card 1 Make an opening in the OCP Card Area 2 Take out the OCP Mezz LAN Card and align with the IO Port opening in the OCP Card Area Install the OCP Mezz LAN Card into the IO Port...

Page 41: ...Drive at rear Follow these instructions to install the 2 5 SATA SSD HDD 1 Unlock the knob and place the 2 5 SSD HDD tray on top of the OCP Card Area 2 Locate the guide pins Align and install the SSD m...

Page 42: ...http www tyan com 42 3 Connect the cable to the connector on the SSD module and secure the SSD tray knob...

Page 43: ...SDs HDDs Follow these instructions to install a hard drive 1 Pull up and slightly push forward to release the HDD tray Then remove the HDD tray from the chassis 2 Attach two blue rubber washers to the...

Page 44: ...HDD tray 4 Take out the screw pack from the AK box Flip over the HDD tray and secure with four screws as illustrated 2 5 HDD SCREW P N 372000000013 3 5 HDD SCREW P N 371000000406 5 Carefully install...

Page 45: ...pplied rack mounting kit Rack mounting kit Rails x 2 Screw Sacks x 2 2 2 1 Installing the Server in a Rack Follow these instructions to mount the GT93 B7106 into an industry standard 19 rack Note Befo...

Page 46: ...Rails to the Rack 1 Take out the rails from the accessory kit 2 Push the tab in the direction as the arrow shows to draw out the inner rails 3 Attach the inner rails to both sides of the chassis Push...

Page 47: ...then push the inner rail forward to unlock 4 Attach the outer rail to the rack Pull the latch open and align the square stud with the square hole on the rack rail Please note that the square stud must...

Page 48: ...http www tyan com 48 Front 5 Repeat the same procedures for the other side...

Page 49: ...Draw out the rails half way and then slide the chassis into the rails Must be done with at least 2 people Properly place the chassis directly on the rack and install 2 Slide in the chassis half way to...

Page 50: ...http www tyan com 50 3 Fasten the chassis ear to the front surface of chassis...

Page 51: ...ease the chassis ear by loosening the screw 2 Pull out the chassis half way to the lock position Push the white locking tabs forward to slide the chassis all out from the rack Caution Remove the serve...

Page 52: ...http www tyan com 52 NOTE...

Page 53: ...place the pre installed components including the S7106 Motherboard M1723G86 FPB Front Panel Board M7106 L16 1F Riser Card M7106G93 BP6 4 HDD Backplane Board M1625G93 D PDB Power Distribution Board Sys...

Page 54: ...the cover of GT93 B7106 3 4 Replacing the Power Supply To replace the power supply follow these instructions 1 Press the latch as shown to pull out the power supply module 2 Replace a new single powe...

Page 55: ...these instructions to replace the M1723G86 FPB Front Panel Board 1 Loosen three screws and disconnect the front panel cable 2 After replacing with a new Front Panel Board follow the steps described ea...

Page 56: ...6 3 5 1 Front Panel Board Features M1723G86 FPB Front Panel Board Form Factor 39x50x1 6mm 4 layer PCB Integrated I O 1 Signal Connector J5 1 PWR Button 2 UID Button 3 Reset Button 4 PWR LED 6 Warning...

Page 57: ...replace the M7106G93 BP6 4 HDD Backplane Board 1 Release the cable tie to disconnect cables 2 Unscrew to remove the HDD BP Board 3 After replacing with a new HDD Backplane Board follow the procedures...

Page 58: ...1 HDD BP Board Features Front View Rear View M7106G93 BP6 4 HDD Backplane Board Form Factor 380mm 16mm 23 7mm 4 layer Integrated I O 1 1x4P Power connector PW2 1 Mini SAS Connector to MB J3 4 SAS SAT...

Page 59: ...istribution Board 1 Disconnect all cables connected to the Power Distribution Board 2 Pull the power supply modules slightly away from the chassis Unscrew to replace the M1625G93 D PDB Power Distribut...

Page 60: ...tp www tyan com 60 3 7 1 Power Distribution Board Features M1625G93 D PDB Power Distribution Board Form Factor 122mm 105 6mm 35 1mm 6 layer Specifications 1 1 PSU redundancy PDB for DELTA DPS 650AB 14...

Page 61: ...upply slot J3 Power supply slot PWR1 Micro fit Power 12x2 PW6 Micro fit Power 4x1 PW7 Micro fit Power 4x1 PW9 Micro fit Power 4x1 PW10 Micro fit Power 4x1 PW11 Micro fit Power 4x1 PW2 Micro ATX Power...

Page 62: ...Follow these instructions to replace the M7106 L16 1F Riser Card 1 Lift up the Riser Card Bracket from the chassis 2 Unscrew to replace with a new riser card 3 Follow the steps described earlier in r...

Page 63: ...p www tyan com 63 3 8 1 Riser card Feature M7106 L16 1F Riser Card Form Factor 123mm 29 7mm 15 4mm 4 layer Specification PCI E x16 Gen3 adapter card 1 PCI E x16 Gen3 slot support 1 PCI E x16 Add on ca...

Page 64: ...nect the fan cable 2 Lift up the fan module for replacement 3 Place the new fan into the chassis and reconnect the fan cable Please refer to the following picture for fan connector locations on the ma...

Page 65: ...http www tyan com 65...

Page 66: ...g the Motherboard After removing all of the aforementioned components follow these instructions to remove the motherboard from the chassis 1 Disconnect all cables Unlock the knob to lift up the Riser...

Page 67: ...http www tyan com 67 2 Unscrew the motherboard to lift it up for replacement...

Page 68: ...http www tyan com 68 NOTE...

Page 69: ...1 Flash Utility Every BIOS file is unique for the motherboard it was designed for For Flash Utilities BIOS downloads and information on how to properly use the Flash Utility with your motherboard ple...

Page 70: ...on up to BDS 0x90 0xCF BDS execution 0xD0 0xDF DXE errors 0xE0 0xE8 S3 Resume PEI 0xE9 0xEF S3 Resume errors PEI 0xF0 0xF8 Recovery PEI 0xF9 0xFF Recovery errors PEI Standard Checkpoints SEC Phase Sta...

Page 71: ...tialization North Bridge module specific 0x17 Pre memory North Bridge initialization North Bridge module specific 0x18 Pre Memory North Bridge initialization North Bridge module specific 0x19 Pre memo...

Page 72: ...Memory South Bridge initialization South Bridge module specific 0x3D Post Memory South Bridge initialization South Bridge module specific 0x3E Post Memory South Bridge initialization South Bridge modu...

Page 73: ...ered by firmware Auto recovery 0xF1 Recovery condition triggered by user Forced recovery 0xF2 Recovery process started 0xF3 Recovery firmware image is found 0xF4 Recovery firmware image is loaded 0xF5...

Page 74: ...dule specific 0x6C North Bridge DXE initialization North Bridge module specific 0x6D North Bridge DXE initialization North Bridge module specific 0x6E North Bridge DXE initialization North Bridge modu...

Page 75: ...vices connect 0x99 Super IO initialization 0x9A USB initialization is started 0x9B USB Reset 0x9C USB Detect 0x9D USB Enable 0x9E 0x9F Reserved for future AMI codes 0xA0 IDE initialization is started...

Page 76: ...outh Bridge initialization error 0xD3 Some of the Architectural Protocols are not available 0xD4 PCI resource allocation error Out of Resources 0xD5 No Space for Legacy Option ROM 0xD6 No Console Outp...

Page 77: ...is entering S3 sleep state 0x04 System is entering S4 sleep state 0x05 System is entering S5 sleep state 0x10 System is waking up from the S1 sleep state 0x20 System is waking up from the S2 sleep sta...

Page 78: ...http www tyan com 78 NOTE...

Page 79: ...nt shall Tyan be liable for direct indirect incidental special or consequential damages arising from the BIOS update or recovery The BIOS Recovery file is named xxxx cap where the xxxx portion is the...

Page 80: ...the server during the BIOS recovery process This can damage the BIOS recovery bootloader and prevent it from loading a subsequent time 7 Wait for the BIOS recovery procedure to complete Completion is...

Page 81: ...e FAN5 SYS_FAN_2 Fan6 Cable FAN6 FAN_HD1 SYSTEM FAN to M1625 PDB Cable SYSTEM FAN Connect to M1625G93 D PDB Fan6 Cable FAN6 SYS_FAN2 2 Mini SAS Cables M7106 BP to S7106 MB Cable M7106G93 BP6 4 Connect...

Page 82: ...G93 D PDB SATA Cable SSD PW10 5 Power Cables M1625 PDB to S7106 MB Cable M1625G93 D PDB Connect to S7106 2x12P Cable PWR1 PWR1 2x4P Cable PW2 PW2 2x4P Cable PW5 PW1 PSMI Cable PW1 PSMI Header M1625 PD...

Page 83: ...BIOS Temp sensor name explanation is also included for readers reference NOTE The red mark indicates the temp sensor Fan and Temp Sensor Location 1 Fan Sensor It is located in the third pin of the fa...

Page 84: ...http www tyan com 84 BIOS Temp Sensor Name Explanation...

Page 85: ...of MB Air Inlet Area SYS_Air_Outlet Temperature of System Air Outlet Area PCH_Temp Temperature of the PCH P0_MOSFET Temperature of the CPU0 MOSFET P1_MOSFET Temperature of the CPU1 MOSFET P0_DIMM_MOSF...

Page 86: ...H_C Max temperature of CPU1 DIMM channel C P1_MC1_DIM_CH_D Max temperature of CPU1 DIMM channel D P1_MC1_DIM_CH_E Max temperature of CPU1 DIMM channel E P1_MC1_DIM_CH_F Max temperature of CPU1 DIMM ch...

Page 87: ...7 IEC C13 AWG 16 250V 1 83 meter EU Power Cord FRU CS 0550 332810000517 NEMA 5 15P IEC C13 AWG 16 250V 1 8 meter US Power Cord Compatible Accessories FRU RC 0471 411T56500035 Riser Card M7106 L16 1F...

Page 88: ...http www tyan com 88 NOTE...

Page 89: ...expectations TYAN s website http www tyan com provides easy to access resources such as in depth Linux Online Support sections with downloadable Linux drivers and comprehensive compatibility reports f...

Page 90: ...oper maintenance of products NOTE A receipt or copy of your invoice marked with the date of purchase is required before any warranty service can be rendered You may obtain service by calling the manuf...

Reviews: