14
The pair of stabiliser arms can now be telescoped upwards/forwards to allow the top
link coupler to be fitted to the tractor top link position. Secure upper end of stabiliser
to tractor top link point using tractor top link pin and spring pin.
The top link stay - between Hedgetrimmer and stabiliser frame may have to be
lengthened/adjusted to suit.
START-UP TRACTOR
Raise whole machine on linkage until a height is reached which gives a reasonably
horizontal path for the P.T.O shaft and approximately 300mm.
With machine at this height setting the 20mm diameter locating pin for stabiliser arms
should be fitted through pair of nearest matching holes, and secured with 7/16" pin and
ring (both arms) -
Ensure chosen setting is same on both arms.
Tighten M20 setscrew to each stabiliser arm - to lock together.
Lower three-point linkage to allow weight of machine to be taken on stabilisers.
Tractor lower linkage check chains assemblies should now be tightened to make sure
tractor arms are locked and machine is positioned centrally at rear of tractor.
Top link should be adjusted to ensure Hedgetrimmer is upright.
Check the P.T.O shaft length.
When connected from tractor to machine it should engage by 1/3rd of the total shaft
length, i.e. male part should be halfway from the end to fully ‘bottomed’ out. Do not
use the machine until this has been cut to the correct length.
Summary of Contents for TC526
Page 1: ...TWOSE TC526 Hedgecutter Grass Mower Operation Manual Publication No 676 June 2011 Rev 09 01 12...
Page 2: ......
Page 6: ......
Page 10: ......
Page 15: ...4 SAFETY INFORMATION...
Page 27: ...16 1 2 3 4 5 6...
Page 28: ...17 8 10 7 9 12 11...
Page 29: ...18 FLAIL MOTOR HOSE INSTALLATION...
Page 33: ...22 CABLE CONTROLS LEVER FUNCTIONS...
Page 34: ...23 SWITCHBOX CONTROLS Operation and Functions...
Page 36: ...25 MONOLEVER CONTROLS Operation and Functions...
Page 38: ...27 PROPORTIONAL CONTROLS Operation and Functions...
Page 56: ......