4. Locate Hearth/Base (A) and set out fin-
ished side up on the floor.
5. Insert one Wood Dowel (N) into each of
the pre-drilled holes.
6. Attach the completed Front Panel assem-
bly from step 3 to the Hearth/Base (A).
Make sure that dowels seat into the pre-
drilled holes in the Hearth/Base. Using
Bolt (L) and Washer (M) attach panels
through pre-drilled holes in the mounting
blocks.
HAND TIGHTEN ONLY.
7. Locate Left Side Panel (E) ,insert one
Wood Dowel (N) into each of the pre-
drilled holes.Then use Bolt (L) and
Washer (M) through the pre-drilled holes
in the mounting blocks. Attach the Side
Panel to Hearth/Base (A) and the
completed front assembly.
HAND TIGHTEN ONLY.
8. Locate Right Side Panel (F),
i
nsert one
Wood Dowel (N) into each of the pre-drilled
holes on the bottom edge of the panel.
Slide into place,and attach to Hearth/Base
with Bolt (L) and Washer (M) through the
pre-drilled holes in the mounting blocks.
Then attach to completed front assembly
using Bolt (L) and Washer (M).
HAND TIGHTEN ONLY.
A
E
N
N
N
L
M
L
L
M
M
L
M
Hearth/Base
Completed
Front
Assembly
Completed Assembly
Left
Side
Panel
Right
Side
Panel
F
E-3
23CM100-ESF-11May_06.indd 4
2006-5-11 20:59:32