8
PACKAGING INFORMATION AND PRODUCTION INSTRUCTIONS
8.4 Production Instructions
1. Tuya’s stamp hole package module must be mounted by SMT machine within
24 hours after unpacking and programming of firmware. Otherwise, it must be
packaged again under vacuum. The module must be baked before mounting.
A. SMT equipment
• Reflow soldering machine
• Automated optical inspection (AOI) equipment
• Nozzle with a 6 mm to 8 mm diameter
B. Baking equipment
• Cabinet oven
• Anti-static heat-resistant trays
• Anti-static heat-resistant gloves
19 / 25
Summary of Contents for WBR3L
Page 5: ...1 PRODUCT OVERVIEW Baby monitor Network camera Intelligent bus 2 25 ...
Page 17: ...7 POWER ON SEQUENCE AND RESETTING 14 25 ...
Page 20: ...8 PACKAGING INFORMATION AND PRODUCTION INSTRUCTIONS WBR3L PCB Layout is shown as belows 17 25 ...
Page 25: ...8 PACKAGING INFORMATION AND PRODUCTION INSTRUCTIONS 8 6 Storage Conditions 22 25 ...