4
SJ-35
May 2017
INSTALLATION INSTRUCTIONS
1. Carefully remove sliding jack from its package.
2. Pump jack to top by the hand pump. Check that the hydraulic oil quantity is enough and
hose is properly connected.
3. Lower the jack completely down by moving the lock release lever to the right, while turning
the hydraulic release valve knob counter-clockwise.
4. Slide out the slider body assembly extensions on both sides to match the width between
the runways.
5. Put the jack on the edges of the runways (Fig. 3), while ensuring to center the jack
between the runways.
6. Remember to secure the roller body assembly extensions into position by tightening the
bolts after the jack is centered (Fig. 3).
NOTE: Make sure the jack can slide freely on the runways with both nylon pads
making full contact with top edges of runways.
Fig. 3
SAFETY INSTRUCTIONS
•
Never allow unauthorized or untrained persons to operate the sliding jack.
•
Thoroughly train all employees in the use and care of sliding jack.
•
Never overload sliding jack. Capacity of sliding jack is stated on the nameplate.
Capacity should not be exceeded.
•
Observe and avoid any pinch point areas of the linkage mechanism.
DO NOT OVERLOAD JACK!!!
r o ll e r b o d y
e x t e n s i o n b o l ts