TUV GR-2110/ST Manual Download Page 3

923211006

_09_00

1

Page

 

3 from 4

Figure 1

1. 

To instal the device you have to dismantle carefully the device with a flat screwdriver as

     shown on figure 1.

2. 

Pass the mains cables through the hole  (point 1 on figure 2).

 

The luminaire must be

    connected to a permanent electrical installation

 to ensure

 the 

immobilization of the cable.

3. 

Mount the base plastic on the wall by using the included  mounting accessories in points 2

    and 3 on figure 2.

4. 

Connect the battery`s cable with the appropriate terminal (figure 3).

5

Connect the mains cables to the respective detachable terminal block

Ν 

for neutral

L for live

     wire

 and 

L1 for the 

 

maintained operation

The L

wire can be connected to an external switch

     to control the maintained or non maintained  operation of the luminaire

For permanent maintained 

     operation use two wires to power the luminaire, 

Ν 

for neutral and L for live wire, and link the L and

     L1.

 (figure 3) Minding the

     correct polarity. Depending on the module that will be used, the cables that will be used, have
     different names. In A, L, C are also connected, while signals -L, NC/NO in the terminal B.
6

 Refit with care the removed plastic parts and power on the luminaire.

If you use a module pass the 2 signal cables on the A, B terminals

Controled operation 
of the illumination source

NOTE!!
After finishing the installation you must power the luminaire at least for 24 hours for battery charging to perform the nominal 
autonomy. 

INSTALLATION INSTRUCTIONS

2

3

Figure 2

Figure 4

1

N

N

L

L

External 

switch

Link

Permanent 
operation of the illumination source 

N

N

L

L

L1

L1

Battery’s

connector

Figure 

3

Α

Β

Reviews: