
923211006
_09_00
1
Page
2 from 4
ΑΤΤΕΝΤΙΟΝ
!!!
1. Operations for installation, maintainance or testing must be
done by authorized personnel only
.
2.
The device must be connected to the mains power supply
through a fuse dependent by the total amount of the line’s power
load
.
t i
in battery recycling
points.
Do not incinerate.
NOTE:
LED=
Light Emitting Diode
LABELING EXPLANATION:
X:
Self contained
1:
Maintained
(*)
A:
Including test device
F:
Automatic test gear complying with IEC 61347-2-7 denoted
EL-T
*90:
1.5 hour duration
180:
3 hours duration
(*)
Maintained operation: The luminaire lights its illumination
source, when it is powered by the mains power supply or not
.
Non Maintained operation: The luminaire lights its illumination
source,
only in power supply’s failure.
Battery replacement
.
It can be done only by a competent person and after the mains
interruption
.
1.
Dismantle the device
(step 1 of
the installation
instructions)
.
2. Disconnect the connector and remove the old battery.
3. Connect the new battery with the same type (step
4
of the
installation
instructions
) and
place it in the position of the old one.
4. Follow the step
6
of the installation procedure and power the
device
.
3
.
In case of inactive use for a period greater than 2 months,
disconnect the battery by pulling out the battery’s connector.
4
.
I
s not allowed to discard batteries in to common trash
bins, they must be discarded only
LED MODULE CHARACTERISTICS
Manufacturer
Model Number
Voltage Range
Connections
Nominal Power
Temperature (tc)
Olympia Electronics S.A
45 °C max. across the board
Non reversible connection between main pcb and led module
8.7-10.8VDC
780mW
3105165
GR-21
0
0/ST
/
M
GR-2110/ST
/
M