![Turtle Tough TT-ISE-CL2 Manual Download Page 28](http://html1.mh-extra.com/html/turtle-tough/tt-ise-cl2/tt-ise-cl2_manual_1182459028.webp)
TURTLE
TOUGH
®
28
analyser
Locate at approximate shoulder height for convenience. The
TT-ISE-CL2
should be level from side
to side and front to back.
1.
Attach the four mounting feet to the rear of the electronics enclosure using the included
5/16"-18 x 1/2" flat head screws.
2.
Anchor securely to the wall or panel. The analyser on mounting panel weighs 19 pounds
1. Connect the supplied 1/4” ID x 3/8” OD x 3’ long, clear flexible PVC sample hose to the
existing plumbing. Cut if necessary to keep the sample line as short as possible.
2. Route the supplied 1/4” ID x 3/8” OD x 3’ long, clear flexible drain tubing as needed.
3. If needed cut the grab sample tap tubing to desired length.
Summary of Contents for TT-ISE-CL2
Page 2: ...TURTLE TOUGH 2...
Page 34: ...TURTLE TOUGH 34 8 9 10 analyser...
Page 35: ...TURTLE TOUGH 35 analyser...