54
mWing
Installation and mounting
4. Mount the other nuts on the threaded rods so that the top edge of the
FlowMotion base plate is flush with the finished floor.
5. Position the FlowMotion base plate.
6. Fix the FlowMotion base plate with nuts.
2
3
1
0.16"
1
4
3
2
Mag0
111
3
Fig. 24: Positioning the FlowMotion base plate
1 Planned finished floor
2 Nut
5/16" dia. (
M8
)
below the planned finished floor (8 x)
3 Base plate FlowMotion
4 Nut
5/16" (
M8
)
for fixing the base plate (8 x)
www.TURNSTILES.us | [email protected] | 303-670-1099