7. ASSEMBLY OF THE DEVICE
The inlet dimensions of the gas connection are defined in the
TECHNICAL SPECIFICATIONS schedule.
After the device is connected to the gas system, the gas leakage should
be checked by soap foam.
The air adjustment should be done if found necessary after the control
done by the personnel of the authorized service.
* The declared power of the device may never be changed as per the
user demands. All kinds of interventions to the valves and injectors for
such purposes will cease the guarantee coverage of the device.
Do not let use of spare parts in the device which are not original.
If the spare parts which are not obtained from our company are installed
on the device, the device will cease to be under guarantee coverage.
GAS CONNECTION DIMENSIONS
A: 30 MM
B: 50 MM
USED GAS:
G20 (NATURAL GAS)
LABEL SAMPLE
Summary of Contents for 0510-OCK 0510-OCKDLP
Page 6: ...6 4 GENEL ÖLÇÜLER VE UYARICI İŞARETLER SICAK YÜZEY ETİKET ÖRNEĞİ ...
Page 12: ...12 8 KUMANDA PANOLARI 700 lük SERİ OCAKLARIN ÖN PANELİ B A A ÇAKMAK B EMNİYET VALFİ ...
Page 21: ...21 4 GENERAL DIMENSIONS AND WARNING SIGNS HOT SURFACE LABEL SAMPLE ...
Page 27: ...27 8 CONTROL BOARDS FRONT PANNEL OF THE STOVES OF 700 SERIES A LIGHTER B SAFETY VALVE ...
Page 37: ...37 4 DIMENSIONS GENERALES ET SIGNAUX D AVERTISSEMENT SURFACE CHAUDE EXEMPLE D ETIQUETT ...