background image

Arraying and Rigging 

TCS series 

TCS series Arraying and Rigging - Page 3 

 

cabinets where appropriate.  

Flying multiple cabinets 

When creating loudspeaker arrays the essential components are a pair of steel flyplates fitted to the 
sides of each flown cabinet, ensuring that all the rigging is steel-to-steel without any load being taken 
through the cabinets’ woodwork. Sets of joiners mate with the flyplates to connect one cabinet to the 
next adjacent cabinet. 
Following is a summary of the kits required and their component parts.  
 

FP-1 KIT 07G0335 

Consists of a pair or steel flyplates that fit both the TCS-122 and TCS-152 cabinets.  
1 x FP-1 kit is required for each cabinet that is to be arrayed.  
The FP-1 kit includes two flyplates, four M10 x 40mm bolts and four M10 spring 
washers. 

 

 

FP-2 KIT 07G0340 

Consists of a pair of steel flyplates for the flyable TCS-B15A and TCS-B15B 
subs. 1 x FP-2 kit is required for each sub cabinet. The TCS-B15A is 
dimensioned to fly with the TCS-122, while the TCS-B15B is dimensioned to fly 
with the TCS-152. 
The FP-2 kit includes two plates, four M10 x 40mm bolts and four M10 spring 
washers. 

 

 
With the flyplates installed on each box to be flown, now select the appropriate inter-cabinet couplers 
to connect the flyplates from one box to the flyplates of another.  
 
 

ICC-2H KIT 07G0345 

A pair of steel inter-cabinet couplers for linking two TCS-122 cabinets together. 
The couplers fit into the recesses provided in the flyplates and are secured using 
the M10 bolts and washers that are supplied with the FP-1 flyplate kits. 

 

 

ICC-3H KIT 07G0350 

A pair of steel inter-cabinet couplers for linking two TCS-152 cabinets together. 
The couplers fit into the recesses provided in the flyplates and are secured using 
the M10 bolts and washers that are supplied with the FP-1 flyplate kits. 

 

Summary of Contents for TCS-122 Arraying angd rigging

Page 1: ...other plane of the Dendritic device functions in a similar way to a standard horn The diagram here shows a TCS 122 with the horn in two possible orientations The one on the left is the typical orient...

Page 2: ...ar left can result from a completely different physical array The HF horns are rotated to give 40 h x 90 v and then the whole array is assembled horizontally to give combined coverage of 90 horizontal...

Page 3: ...ists of a pair of steel flyplates for the flyable TCS B15A and TCS B15B subs 1 x FP 2 kit is required for each sub cabinet The TCS B15A is dimensioned to fly with the TCS 122 while the TCS B15B is dim...

Page 4: ...the recesses in the flyplates and are secured with the M10 bolts and washers that are supplied with the FP flyplate kits ICC 6H 07G0365 A pair of steel inter cabinet couplers for linking a TCS 122 ca...

Page 5: ...rd angle ICC 61 07G0370 To hang the TCS 61 as a downfill speaker underneath the TCS 122 you will need a pair of ICC 61 inter cabinet links fitted between the cabinets which positions the TCS 61 at an...

Page 6: ...h x 90 v Parts required 3 x FP 1 kits 6 pcs 2 x ICC 3H kits 4 pcs 2 x M10 eyebolts This diagram shows how bass cabinets are combined in an array of TCS 152 cabinets The mid highs are fitted with FP 1...

Page 7: ...d eyebolt for a pull back attached in the centre of the lower cabinet Parts required 1 x ICC 2V kit 2 pcs 3 x M10 eyebolts The TCS 61 shares the same width dimension as the TCS 122 providing an ideal...

Page 8: ...fixing points assembly methods and fasteners specified in this guide and the specific mounting instructions When assembling the loudspeaker array ensure that all fixings are securely tightened before...

Reviews: