![Tunstall ComStation BUS-C User Manual Download Page 51](http://html1.mh-extra.com/html/tunstall/comstation-bus-c/comstation-bus-c_user-manual_1180090051.webp)
00 8811 17, 08/18 (Rev. 6.0)
49
10. Activating a shift
You only need to read this section, if shifts are assigned to your ward. Ask
your system administrator.
To support zone nursing Tunstall has developed the concept of zones and
shifts:
Zone
A zone is a part of a ward within which calls are forwarded. Calls which are
triggered within the zone are not forwarded to rooms in the ward which lie
outside the zone. Usually, certain nursing staff are responsible for one zone.
Shift
The zones of a ward are not set for the long-term. The zone organisation can
change. Each division of the ward into zones is classed as a “shift“.
A shift refers to the division of a ward into a maximum of 8 zones. Thus, the
zones may overlap each other, i.e. certain rooms can belong to several
zones.
A maximum of 8 different shifts can be defined for each ward. You activate
shifts using the ComStation
BUS-C
.
ComStation
BUS-C
One or more ComStation
BUS-C
units are installed in each ward. According to
the shift, the ComStation
BUS-C
units can belong to different zones. If a ward
is divided into zones, but only has one ComStation
BUS-C
unit, the system is
usually programmed that the ComStation
BUS-C
belongs to all zones.
Examples
On the following pages you will find two examples of shift division.
Summary of Contents for ComStation BUS-C
Page 1: ...ComStation User Guide 00 8811 17 Order no 77 0605 50 BUS C...
Page 12: ...3 Necessary basic knowledge 10 00 8811 17 08 18 Rev 6 0 Sample ward 24V...
Page 56: ...10 Activating a shift 54 00 8811 17 08 18 Rev 6 0...
Page 62: ...11 Changing default settings 60 00 8811 17 08 18 Rev 6 0...
Page 66: ...12 Put the ComStationBUS C into operation 64 00 8811 17 08 18 Rev 6 0...
Page 69: ......
Page 70: ......
Page 71: ......