background image

  

TUFX - FORT MANUFACTURING INC.

                               

 

DESIGNED 

TO WORK            

                                                                                                                           

12| 

P a g e

 

 

 

Step

–14

  Attach the steering wheel(10) on the spring leg(3) side by 1 set of M12x45mm 

HEX bolts and M12.0mm nuts provided.  

 

    

 
 

Step-15

    Apply  gasket  cement  between  top(29)  and  bottom(31)  of  the  drum  and  fix  it 

using 6 sets of M6x16mm HEX bolts and M6.0mm nuts with washer  diameter 
6.0mm as shown in below pictures. 

 
 

 

 

 
 
 
 

Summary of Contents for BI135F

Page 1: ...UFACTURING INC DESIGNED TO WORK TUFX FORT MANUFACTURING INC 609 COLBY DRIVE WATERLOO ONTARIO N2V 1A1 Contact No 519 746 1920 E Mail support tufx fort com www tufx fort com Assembly Instructions BI135F...

Page 2: ...ashers of 0 65 0 9inch dia 650355 Motor Shaft Compl 13 2 14 15 16 2 17 18 2 20 21 8 43 44 650356 Pinion Guard Compl 19 9 2 sets of 0 75x1 inch Hex bolts 0 75inch Nuts and washer dia 0 75 inch 650357 C...

Page 3: ...TUFX FORT MANUFACTURING INC DESIGNED TO WORK 2 P a g e Retrieved from Tufx Fort Manufacturing Inc 2021 March 11 BI135F concrete mixer operation parts manual Rev D110228 page 13...

Page 4: ...nt Mixer Step 1 Build leg 2 with wheel 4 of the BI135F Cement mixer remove 2 sets of bolts provided from wheel axle Check the picture given below Step 2 Insert wheels 4 on both sides of the legs 2 and...

Page 5: ...4 P a g e Step 3 Take the other leg 3 of cement mixer and insert it in upper frame part 1 of the mixer as following Step 4 Fix the leg 3 using 2 sets of M8X70mm HEX bolts and M8 0mm nuts with Washer...

Page 6: ...TUFX FORT MANUFACTURING INC DESIGNED TO WORK 5 P a g e Step 5 Assemble leg 2 with wheels 4 to upper frame part 1 as following picture...

Page 7: ...4 using 4 sets of M8X25 mm HEX bolts and M8 0 mm nuts with washer diameter 8 0mm to the upper frame part 1 as shown in image below Step 7 After assembling the wheeled leg 2 attach the locking bar 7 to...

Page 8: ...TUFX FORT MANUFACTURING INC DESIGNED TO WORK 7 P a g e Step 8 Place Electric motor panel 33 to 39 42 on the wheeled leg 2 side of the frame...

Page 9: ...the electric motor panel 33 to 39 42 with 2 sets of M8X100mm HEX bolts and M8 0mm nuts with washer diameter 8 0mm as shown in image below Step 10 Attach the black cover 40 of the electric motor panel...

Page 10: ...FORT MANUFACTURING INC DESIGNED TO WORK 9 P a g e Step 11 After attaching black cover 40 place and align the bottom of drum 31 on gear side first Then place it on the spring lock 23 side as shown in i...

Page 11: ...FX FORT MANUFACTURING INC DESIGNED TO WORK 10 P a g e Step 12 Fix the bottom of the drum 31 on both the gear side 9 by 2 sets of M8x25mm HEX bolts and washer diameter 8 0mm provided as shown in pictur...

Page 12: ...RT MANUFACTURING INC DESIGNED TO WORK 11 P a g e Step 13 Place end cover 32 on the spring leg side to fix the drum 31 on other hand with 1 set of M8X70mm HEX bolts and M8 0mm nuts with Washer diameter...

Page 13: ...ring wheel 10 on the spring leg 3 side by 1 set of M12x45mm HEX bolts and M12 0mm nuts provided Step 15 Apply gasket cement between top 29 and bottom 31 of the drum and fix it using 6 sets of M6x16mm...

Page 14: ...URING INC DESIGNED TO WORK 13 P a g e Step 16 After assembling drum attach the two mixing blades 30 inside the drum using 4 sets of M8x25mm oval bolts and M8 0mm nuts with washer diameter 8 0mm as sho...

Page 15: ...TUFX FORT MANUFACTURING INC DESIGNED TO WORK 14 P a g e Step 17 End product BI135F Cement Mixer...

Reviews: