background image

Page 14

Solid Plastic Tufftec 2.0 Locker Installation Instructions

Section 7: Fillers Continued

Corner Filler Attachment: (Double)

Note:

 Blocking (wood, metal stud, etc.) is required to install fillers. Blocking is 

NoT provided by Scranton Products.

Refer to the Scranton Products layouts for filler location and sizes. Align your 
fillers and mark for blocking and the intersection where the two fillers meet. 
Pre-drill the lockers using a 1/8" drill bit and countersink the holes. Attach your 
blocking using the 1" countersunk 
screws provided. Next align the two 
fillers that you had previously marked 
and use the same method as stated 
above for pre-drilling and attaching. 
Finally set your corner filler into place 
and pre-drill and fasten into the 
blocking. 

For an optional method produce 
a corner brace using two pieces of 
blocking and pre-drill and attach using 
the same methods as above.

Summary of Contents for 2.0 Locker Series

Page 1: ... 2 0 Locker Installation Instructions Please read all of the installation instructions prior to installing this product If you have any questions contact Scranton Products as soon as possible before installing this product ...

Page 2: ...r fax 800 551 6993 Section 1 Terminology Section 2 Components Section 3 Site Preparation Section 4 Hardware Section 5 Bases Section 6 Lockers Section 7 Fillers Section 8 Flat Tops Section 9 Slope Tops Section 10 End Panels Base Trim Tools Needed Chalk Line Tape Measure Screwdrivers Phillips and Flat head Adjustable Wrench Level Jigsaw Power Drill with a Drill Index Masonry Bits and a Countersink B...

Page 3: ... A group of several 1 3 frames built as one unit Shown above is a Bank of three Profile The profiles are the connection pieces that are used to join the panels together Base Are constructed of 3 4 black material used as a foundation or a supporting member Filler 1 2 trim fillers used to fill a void or cavity Flat top 1 2 material provided for locker tops 60 or below Slope Top 1 2 material provided...

Page 4: ... 4 Solid Plastic Tufftec 2 0 Locker Installation Instructions Section 2 Components A Door Assembly B Rear Panel Back C Side Panel D Top Bottom Panel With Corresponding Profiles E Face Frame Multiple Pieces ...

Page 5: ... pay special attention to these areas while attaching the lockers Note If you have ordered the lockers with a base you will be able to float the base over any low spots in the floor Shimming may be required to ensure that the base will sit evenly and securely on the floor Any variations in the walls that the lockers will be attaching to should be addressed prior to beginning your installation You ...

Page 6: ...Page 6 Solid Plastic Tufftec 2 0 Locker Installation Instructions Section 4 Hardware ...

Page 7: ...o your Scranton Products Locker drawings for the correct position and layout the bases Attach the four pieces into the corner brackets and fasten using the 3 4 torx head fasteners T 27 Note When positioned properly the outside face will set flush with the corner bracket Next place your spreaders into position The base is pre drilled and countersunk not drilled through Using a 1 8 drill bit drill t...

Page 8: ...nt as a reference to ensure that the lockers will sit level after installation Failure to do so will result in the locker tops being uneven Fasten the bases to the floor using the 2 aluminum angle brackets 1 3 4 tapcon screws the base to the wall using 2 3 4 tapcon screws and use 1 1 2 torx head fasteners T 27 to attach base to base Before securing the angle brackets to the floor be sure to shim a...

Page 9: ...ee below Use this to determine the location of the different banks on the job Locate the bank required for this area Place the bank into position and check for fit Make sure that the bank is set square and level This is crucial since you will be attaching the next banks to this first one Anchor the bank into position using the 1 3 4 tapcon screws provided The bank will be attached to the wall at t...

Page 10: ...cond bank to the first bank using the 7 8 torx head thru bolts T 30 provided join the banks together being careful not to over tighten the screws at this time Locate the next banks required and continue joining them together Once you have several banks joined together you can go back and attach these to the walls Attach to the wall at the first frame on the right side of each bank Note If shimming...

Page 11: ...ur corners of the bank Securely fasten using the 1 2 torx head thru bolts T 30 provided Lockers should sit flush and level This will provide a rigid starting point Begin setting the next bank into place attaching side to side and then back to back keeping the lockers level and securely fastened If bases are provided then secure using 1 1 2 torx head fasteners T 27 If bases are not provided attach ...

Page 12: ...In the example below blocking will need to be attached to the wall and the locker Where attaching to walls fasteners are not provided due to varying field conditions Preset your fillers into place marking locations for blocking When installing blocking to the locker pre drill from the inside using a 1 8 drill bit and countersink before fastening Using the 1 countersink fastener attach your blockin...

Page 13: ...e corner fillers are provided oversized by 3 Align your filler with the lockers and mark for your blocking Pre drill blocking A using a 1 8 drill bit and countersink the holes Fasten from the inside of the locker using the 1 countersunk fastener Slide your filler into place and pre drill and fasten using the same methods as stated above Next pre drill B through the inside locker and through the fi...

Page 14: ...for blocking and the intersection where the two fillers meet Pre drill the lockers using a 1 8 drill bit and countersink the holes Attach your blocking using the 1 countersunk screws provided Next align the two fillers that you had previously marked and use the same method as stated above for pre drilling and attaching Finally set your corner filler into place and pre drill and fasten into the blo...

Page 15: ... the flat top panels for the section you are working in Next line up the flat top panel with the back edge of the lockers Pre drill the flat top panel using a 1 8 drill bit from inside the cabinet Fasten the flat top to the lockers using the 5 8 pan head screw fastening from inside the cabinet Note Locker cabinets are 3 8 thick and flat tops are 1 2 thick Fastening from inside the cabinet allows m...

Page 16: ...nstalled for the slope tops is the 1 thick rear support Mark the location for the rear support and snap a chalk line along the entire row Please note that the rear supports are generally random lengths colors and will be concealed under the slope top so joints do not have to be perfect Fasten the rear support to the wall using the 2 3 4 tapcon screws provided Note If your layout requires an inside...

Page 17: ...o the wall and Section B will have your compound miter corner When installing slope tops in a corner begin by installing the 1 thick rear support for section A Next take the corresponding 3 strip and profile and snap them together Fasten the strip to the locker using the 5 8 pan head screws provided Next slide your slope top into place Do not fasten at this time Slide the 1 thick rear support for ...

Page 18: ... can go ahead and install the rear support for section B Next take the corresponding 3 strip and slope top profile and install using the same method of attachment as stated earlier Finally take your slope top with the compound miter corner and slide into place and pre drill and countersink the holes Using the 1 countersunk fasteners provided fasten into the rear support ...

Page 19: ... cabinet to the under side of the combined 1 rear supports Next fasten from the inside of the cabinet using the 1 1 2 torx head fasteners provided Once the 1 rear supports are installed go ahead and snap your 3 strips and slope top profiles together Pre drill and fasten the 3 strips with slope top profile to the locker front using the 5 8 pan head screws Next slide your slope top pieces into place...

Page 20: ...s are provided with Scranton Products bases and or slope tops the end panels will be detail to conceal these Base Trim Installation If your order was provided with base trim you will have received 1 2 trim pieces the same color as the locker to be fastened to the base Be sure that all the bases and lockers are installed before installing the base trim The base trim is 4 high and runs in long secti...

Reviews: