FIG. 32
Next, route the
Lat Cable (#11)
over the Nylon Pulley 4 1/2
Rd. (#26-Labeled C), as shown above.
Note:
Use Cable Mapping Diagram on page 16 for further detailed
illustration of the
Lat Cable (#11)
routing.
IG. 33
Next, route the
Lat Cable (#11)
up and over the Nylon Pulley 4
/2 Rd. (#26-Labeled D), as shown above.
Note:
Use Cable Mapping Diagram on page 16 for further detailed
illustration of the
Lat Cable (#11)
routing.
FIG. 34
Next, route the
Lat Cable (#11)
over the Nylon Pulley 4 1/2
Rd. (#26-Labeled E), as shown above.
Note:
Use Cable Mapping Diagram on page 16 for further detailed
illustration of the
Lat Cable (#11)
routing.
ig. 31
Assemble the
Adjustable Double Pulley Bracket (#40)
using
wo Nylon Pulleys 4 1/2 Rd. (#26-Labeled G, K), two Hex Head Cap
crews 3/8-16 X 1 3/4 (#50), four Flat Washers SAE 3/8 (#45) and two
Nylon Insert Jam Lock Nuts 3/8-16 (#48).
Note:
The four holes on the
Adjustable Double Pulley Bracket
(#40)
are used to adjust the cable tension once the cable routing
has been completed.
CFM-500 Compact Frontal Machine
10
Owner’s Manual: Assembly Instructions