Tuff stuff AP-5MPD Assembly Instructions Manual Download Page 8

Step  4     Press Bar Assembly

A

 Connect 

the 

Pivot Arm (#12)

 to the 

Main Frame (#10)

 

with the 

Pivot Axle 1 X 5 5/8 (#13)

 

and secure the axle into place 

using hardware shown.

B

 Attach 

the 

Swivel Double Pulley Rod (#18)

 to the 

Pivot Arm (#12)

 with the Rod End 1/2-20 X 1 1/2 (#66) and secure 

them into place using one Shoulder Bolt 1/2 X 1 1/4 (#72) and one Nylon Insert Lock Nut 3/8-16 (#58).

C

  Attach two Pulleys 3/8 X 4 1/2 (#23) to the 

Swivel Double Pulley Rod (#18)

 using hardware shown.  Next, affi x the 

Rubber Bumper 3/8 X 2 1/2 (#67) to the 

Pivot Arm (#12)

 

using hardware shown.

D

 Connect 

the 

Press Bar (#15)

 to the 

Pivot Arm (#12)

 

with the 

Pivot Axle 1 X 5 9/32 (#14)

 

and secure the axle to the 

Press Bar (#15)

 

using two Soc Set Screws 1/4-20 X 3/8 (#75).

E

  Attach the Rubber Bumper 3/8 X 1 1/2 (#68) to the 

Press Bar (#15)

 

using hardware shown.

Assembly List

Item #

Description

Qty.

Item #

Description

Qty.

7

CABLE RETAINER BRACKET

2

43

HEX HEAD CAP SCREW GR-5 B/O 3/8-16 X 1 1/4

1

12

PIVOT ARM

1

46

HEX HEAD CAP SCREW GR-5 B/O 3/8-16 X 3 1/4

1

13

PIVOT AXLE 1 X 5 5/8

1

56

NYLON INSERT JAM LOCK NUT B/O 3/8-16

2

14

PIVOT AXLE 1 X 5 9/32

1

58

NYLON INSERT LOCK NUT B/O 3/8-16

1

15

PRESS BAR

1

66

ROD END 1/2-20 X 1 1/2 MALE

1

18

SWIVEL DOUBLE PULLEY ROD

1

67

RUBBER BUMPER 3/8 X 2 1/2

1

23

ALUMINUM PULLEY 3/8” X 4 1/2”

2

68

RUBBER BUMPER W/WASHER 3/8 X 1 1/2

1

27

BUTTON HEAD SOCKET CAP SCREW B/O 3/8-16 X 1

2

72

SHOULDER BOLT ALLOY 1/2 X 1 1/4

1

29

CHROME WASHER 3/8 X 1 1/2

2

75

SOCKET SET SCREW ALLOY 1/4-20 X 3/8

2

33

FENDER WASHER B/O 3/8 X 2

1

79

SPLIT LOCK WASHER B/O 3/8”

2

37

FLAT WASHER SAE B/O 3/8”

3

81

STEEL BUMPER WASHER Z/P 3/8”

1

41

HEX HEAD CAP SCREW GR-5 B/O 3/8-16 X 1

1

7

AP-5MPS_AP-5MPD  Multi-Press Station

Summary of Contents for AP-5MPD

Page 1: ...A m e r i c a s P r e m i u m E x e r c i s e E q u i p m e n t AP 5MPS_AP 5MPD Rev0 Multi Press Station Includes Assembly for AP 5MPS Multi Press W Nylon Pulleys Standard AP 5MPD Multi Press W Alumin...

Page 2: ...rding to the Parts List and the Exploded View Diagram Tool Requirements 1 One 7 8 combination wrench 2 One 3 4 combination wrench 3 One 9 16 combination wrench 4 One 1 2 combination wrench 5 One ratch...

Page 3: ...23 37 44 34 37 56 37 44 1 23 58 37 58 37 37 46 6 46 56 37 37 44 23 A Weight Stack Frame Weight Stack Frame 2 AP 5MPS_AP 5MPD Multi Press Station Note Some parts have been cut away for clarity B 80 80...

Page 4: ...1 39 HEX HEAD CAP SCREW GR 5 B O 1 2 13 X 4 1 2 2 60 PLASTIC END CAP 2 X 3 3 44 HEX HEAD CAP SCREW GR 5 B O 3 8 16 X 1 3 4 1 62 PLASTIC INSERT CAP 2 SQ 10 14 GA 1 Step 2 Main Frame Assembly A Using a...

Page 5: ...4 AP 5MPS_AP 5MPD Multi Press Station 36 57 36 58 37 7 23 10 23 7 37 37 60 56 37 44 36 55 23 19 37 45 36 39 60 23 37 56 57 46 62 36 39 D C A B Note Some parts have been cut away for clarity 6...

Page 6: ...ription Qty 2 BACK PAD 1 37 FLAT WASHER SAE B O 3 8 6 3 BACK PAD FRAME 1 38 HEX HEAD CAP SCREW GR 5 B O 1 2 13 X 3 1 2 1 4 BENCH FRAME 1 40 HEX HEAD CAP SCREW GR 5 B O 1 2 13 X 5 1 2 3 5 BENCH SEAT PA...

Page 7: ...36 38 27 36 79 29 8 76 21 9 21 76 8 29 79 27 76 55 36 55 40 36 35 36 40 17 68 42 3 36 57 2 76 43 43 16 36 57 10 36 40 4 64 A C B D F E G 6 AP 5MPS_AP 5MPD Multi Press Station Note Some parts have bee...

Page 8: ...8 X 1 1 2 68 to the Press Bar 15 using hardware shown Assembly List Item Description Qty Item Description Qty 7 CABLE RETAINER BRACKET 2 43 HEX HEAD CAP SCREW GR 5 B O 3 8 16 X 1 1 4 1 12 PIVOT ARM 1...

Page 9: ...37 33 23 18 7 67 81 14 66 72 58 41 68 37 56 15 12 27 7 23 75 C A B E D Note It is recommended to use another person in assisting with this assembly 8 AP 5MPS_AP 5MPD Multi Press Station Note Some part...

Page 10: ...r Bracket D Next route the Cable 11 under the Pulley 3 8 X 4 1 2 23 Labeled H6 then to the Pulley 3 8 X 4 1 2 23 Labeled H7 E Route the Cable 11 through the tube of the Bottom Cross Brace 6 then under...

Page 11: ...3 ALUMINUM PULLEY 3 8 X 4 1 2 BNH0069 9 65 PVC 1 X 8 3 4 BNH1611 2 24 BALL BEARING W 516 BNH0628 2 66 ROD END 1 2 20 X 1 1 2 MALE BNH0677 1 25 BRONZE BUSHING 1 X 1 1 4 X 3 4 X 1 1 2 X 1 8 BNH0527 2 67...

Page 12: ...sts on returned or replaced equipment to and from TuffStuff s facility in Pomona THE FORGOING SHALL CONSTITUTE THE SOLE REMEDY OF THE PURCHASER AND THE SOLE LIABILITY OF TUFFSTUFF WITH REGARD TO WARRA...

Page 13: ......

Page 14: ......

Reviews: