102-02920515 - ind.C - 11/2021
53
2-3 NEOLIUM SX 3.60m platform assembly
1.
Repeat steps §2-1.1 to §2-1.3
2.
Assemble the 3 and 6-rung extensions by following §2-1.5.
3.
Assemble the stabiliser extensions by following §2-3.1.
4.
Mount the stabiliser extensions above rung no. 3 and below rung no. 9 by following §2-1.4.
5.
Mount the braces on rung no. 10 and the middle rails on rung no. 8 by following §2-1.6.
6.
Mount the platform on rung no. 14.
7.
Mount the platform on rung no. 6.
8.
Put the toeboards into position.
9.
Assemble 2 x 3-rung extensions to create a 6-rung extension, and pin together with 4 x Ø10
tube-clip pins.
Check the stabiliser spacing
by following §2-3.2.
2
3 & 4
5
6
1
7
8
9
Summary of Contents for NEOLIUM SX
Page 26: ...102 02920515 ind C 11 2021 26 6 7 8 9 10 11 12 a b c et d...
Page 28: ...102 02920515 ind C 11 2021 28 6 7 8 9 10 11 12 13 a b c et d a b c et d...
Page 58: ...102 02920515 ind C 11 2021 58 6 7 8 9 10 11 12 a b c d...
Page 60: ...102 02920515 ind C 11 2021 60 6 7 8 9 10 11 12 13 a b c d a b c d...
Page 89: ...102 02920515 ind C 11 2021 89 6 7 8 9 10 11 12 a b c und d...
Page 91: ...102 02920515 ind C 11 2021 91 6 7 8 9 10 11 12 13 a b c und d a b c und d...
Page 120: ...102 02920515 ind C 11 2021 120 6 7 8 9 10 11 12 a b c y d...
Page 122: ...102 02920515 ind C 11 2021 122 6 7 8 9 10 11 12 13 a b c y d a b c y d...
Page 151: ...102 02920515 ind C 11 2021 151 6 7 8 9 10 11 12 a b c e d...
Page 153: ...102 02920515 ind C 11 2021 153 6 7 8 9 10 11 12 13 a b c e d a b c e d...
Page 182: ...102 02920515 ind C 11 2021 182 6 7 8 9 10 11 12 a b c en d...
Page 184: ...102 02920515 ind C 11 2021 184 6 7 8 9 10 11 12 13 a b c en d a b c en d...
Page 213: ...102 02920515 ind C 11 2021 213 6 7 8 9 10 11 12 a b c e d...
Page 215: ...102 02920515 ind C 11 2021 215 8 9 10 11 12 13 a b c e d a b c e d...
Page 221: ...102 02920515 ind C 11 2021 221...
Page 222: ...102 02920515 ind C 11 2021 222...
Page 223: ...102 02920515 ind C 11 2021 223...
Page 224: ...102 02920515 ind C 11 2021 224...