18-1
Section 18: Option - Twin Wrap Kit -
TL50LSV
Section 18: Option - Twin Wrap Kit
Twin Wrap Kit Installation
Refer to
Parts Manual
to ensure all parts have been
received.
1. Rotate hoop to a position where the twin wrap kit
can be easily placed in position.
DANGER:
Shutoff machine before installation.
2. Open left safety guard.
3.
Place twin wrap kit on top of standard plastic film
carrier.
4. Bolt in place with provided hardware. Handles must
be placed through top side and fully tightened.
5. The 3 socket head bolts must be placed through
bottom side. Do not fully tighten to allow tensioner
to slide. See
Fig.1
.
6. Repeat steps 1-5 for other plastic wrap carrier.
Twin Wrap Kit Adjustments
1. Lift and turn handles to loosen twin wrap.
2.
Slide twin wrap left or right to increase or decrease the plastic film layer overlap.
3. Turn handles to tighten twin wrap and push them down to lock in place.
Fig .1
Fig .1
1
2
3
Summary of Contents for TL50LSV
Page 7: ...Intentionally Left Blank...
Page 12: ...TL50LSV Section 2 Safety 2 3 Clearance Markers Part No DEAMBER Part No DERED...
Page 13: ...2 4 Section 2 Safety TL50LSV Safety Decal Locations NOTE Decals shown are not to scale...
Page 17: ...Intentionally Left Blank...
Page 29: ...Intentionally Left Blank...
Page 56: ...TL50LSV Section 19 Option Laser Guidance System 19 2 Laser Guidance Wiring...
Page 60: ...Intentionally Left Blank...
Page 61: ...VII Imperial Torque Value Chart TL50LSV Imperial Torque Value Chart...
Page 62: ...TL50LSV Metric Torque Value Chart VIII Metric Torque Value Chart...