![TTMC BS-315G Operation Manual Download Page 7](http://html1.mh-extra.com/html/ttmc/bs-315g/bs-315g_operation-manual_1178910007.webp)
6
All handing and transportation operations should be carried out by trained
staff.
5. Machine installation
5.1 Machine check
The machine should be checked to make sure that it has not been damaged during
transportation and handing. If the machine appears to have been damaged, contact
us immediately. Fit all the supplied accessories onto the machine such as #17 bar
stop and #33 roller arm.
5.2 Fastening of the machine
The machine will be able to operate in keeping with the technical parameters
supplied by us, if it is positioned correctly and fastened securely to the bench
or the factory floor so that vibrations are minimal during operation.
5.3 Saw blade assembly
Remove the #145 bow guard by unscrewing #149 screws and #64 Trifurcate handle.
Fit the band by inserting it first between the bearings of the blade guide heads and
then on the two pulleys, tighten the blade slightly by means of #64 Trifurcate handle
and install #145 bow guard. Check that the saw blade is fitted with the correct
direction of teeth. Make sure that the saw blade type (dimensions 2825×27×0.9 mm)
and its teeth pith are suited to the material to be cut.
5.4 Electrical connection to the mains
Install a differential thermo magnetic switch with characteristics suited to the
mains.
Summary of Contents for BS-315G
Page 1: ...0 METAL CUTTING BAND SAW MODEL BS 315G Operation Manual...
Page 15: ...14 9 Part drawing...
Page 16: ...15...
Page 17: ...16 10 Electric drawing...