TSUNESS TSUN TSOL-MP2250 User Manual Download Page 8

TSOL-MP3000/MP2250/MS3000 

                                          

 

 
V1.4 

- 8 -

 

Over-heat protection 

 

Integrated

 

Mechanical Data 
Dimensions (W×H×D mm) 

354 * 294 * 60 

Weight [kg] 

6.4 

6.8 

6.8 

General Data 

Display 

 

LED indicators; TSUN APP+WEB

 

Communication 

 

built-in WiFi module; 4G module (Optional)

 

Type of Isolation

 

Transformerless

 

Type of Enclosure 

IP67 

Cooling 

Natural convection 

Operating Ambient Temperature 
Range 

-25 ~ +65

 

(derating of over 50°C Ambient Temperature) 

Relative Humidity 

100% 

Max. Operating Altitude Without 
Derating [m] 

2000 

  The AC voltage and frequency range may vary depending on specific country grid. 

 

 

Microinverter Installation 

Pre-installation Check 

Check the Package 

Although TSUN’s microinverters have surpassed stringent testing and are checked before they leave 

the factory, it is uncertain that the microinverters may suffer damages during transportation. Please 

check the package for any obvious signs of damage, and if such evidence is present, do not open the 

package and contact your dealer as soon as possible. 

The package list is shown as below: 

 

 

 

 

Microinverter   

AC connecter   

Microinverter SN label   

Monitor SN label   

 

 

 

 

Installation Map 

User Manual 

Bracket (optional) 

 

Summary of Contents for TSUN TSOL-MP2250

Page 1: ...TSOL MP3000 MP2250 MS3000 V1 4 1 TSOL MP3000 TSOL MP2250 TSOL MS3000...

Page 2: ...document complete accurate and up to date Readers are cautioned however that TSUNESS reserves the right to make changes without notice and shall not be responsible for any damages including indirect i...

Page 3: ...roinverter Installation 8 Pre installation Check 8 Installation Steps 9 Talent Monitoring Configuration 16 Got an Account 16 Create a Solar Plant 18 Add a Microinverter 19 Delete a Microinverter 19 Wi...

Page 4: ...the microinverter solution This manual contains important instructions for TSOL MP3000 MP2250 MS3000 microinverters and must be read in its entirety before installing or commissioning the equipment F...

Page 5: ...verter shall only be carried out by qualified personnel The components inside the inverter will release a lot of heat during operation Do not touch metal plate housing during operating Please read the...

Page 6: ...3000 Microinverter Talent web based monitoring and analysis system The microinverter converts the DC electricity generated by solar panels into AC electricity which is in accordance with the requireme...

Page 7: ...250 3000 3000 Nominal Output Current A 10 1 13 6 13 6 Max Output Current A 11 14 14 Inrush Current A 20 25 25 Max Output Fault Current A 45 50 50 Max Output Overcurrent Protection A 27 27 27 Nominal O...

Page 8: ...Derating m 2000 The AC voltage and frequency range may vary depending on specific country grid Microinverter Installation Pre installation Check Check the Package Although TSUN s microinverters have s...

Page 9: ...Only qualified personnel should install troubleshoot or replace TITAN micro inverters or the cable and accessories Before installation check the unit to ensure absence of any transport or handling da...

Page 10: ...re that the label of microinverter should be outside Step 2 Connect the AC cable DANGER Do not install the AC junction box without first removing AC power from the system To prevent electrical hazards...

Page 11: ...tribution network correctly Take out the AC connector from the package Get the AC cable through the shell of AC connecter and connect the cable to the right port The definition of the port is shown be...

Page 12: ...e neutral line to port N as the connection of single phase power grid If the microinverter is connected to 127 220 V three phase power grid connect one live line to port L and connect another live lin...

Page 13: ...are pinched or damaged The DC conductors of this photovoltaic system are ungrounded and may be energized The maximum open circuit voltage of the PV module must not exceed the specified maximum input...

Page 14: ...table corresponds the shorter side of PV module and the column of the table corresponds the longer side of PV module The direction on the upper left corner means the actual installation orientation T...

Page 15: ...ocedures and have received prior approval from the electrical utility company While installation is all finished turn on the main utility grid AC circuit breaker Your system will start producing power...

Page 16: ...ator The administrator is the owner of the largest authority in the organization and has all management function authority such as organization plant operation and maintenance Operation Manager Operat...

Page 17: ...56 Installer Account Installers can contact the distributor to get an account The default password is 123456 Each organization has an Organization Code Find it in the Talent APP or Talent monitoring p...

Page 18: ...MP2250 MS3000 V1 4 18 Create a Solar Plant Use the end user account to login the Talent App Enter the Plants page Find the in the up right corner and click Create Plant Finish the information of the...

Page 19: ...lar plant can only be deleted on the website platform Add a Microinverter Enter the Overview page Find the in the up right corner and click Add Collector Set the monitoring type as RSW 1 10001 Then sc...

Page 20: ...20 Find the in the up right corner and click Unbind Wi Fi Configuration Connect the home Wi Fi first Enter the Me page Click Config Network Scan or enter the monitoring SN Choose the WIFI and enter t...

Page 21: ...TSOL MP3000 MP2250 MS3000 V1 4 21 The networking operation will be done automatically...

Page 22: ...e check the connection of PV module If this fault appears continuously please contact the TSUN service 9 PV2VoltLow_Fault 10 PV3VoltLow_Fault 11 PV4VoltLow_Fault 12 PV5VoltLow_Fault 13 PV6VoltLow_Faul...

Page 23: ...sion can be checked by using the monitoring system Always de energize the AC branch circuit before servicing Do not attempt to dismantle the Micro inverter or make any internal repairs In order to pre...

Page 24: ...disassembled or modified except where such disassembly is carried out by TSUNESS The terms of this Warranty cannot be amended except in writing by one of our authorized officers There must have been...

Page 25: ...ment failure or fault it is the Distributor s responsibility to work directly with TSUNESS Service Centre in order to limit the return of non faulty equipment TSUNESS Service Centre will work with the...

Page 26: ...TSOL MP3000 MP2250 MS3000 V1 4 26...

Reviews: