
30
Chapter 4
5. Replace the cover, power up the monitor and connect it to the
cloud to register the new sensors and their calibration values.
Replacing the PM Sensor
1. Unplug the connector on the left by pressing the locking clips in
from the top and bottom and pulling the connector straight out.
2. Pull the sensor module from the top and pivot it away from the
PC board.
3. Lift the PM sensor module up and away from the case.
4. Reverse the steps for the new sensor.
5. Replace the cover, power up the monitor and connect it to the
cloud to register the new sensor and its calibration values.
Summary of Contents for AIRASSURE 8144
Page 6: ...iv Appendix A Specifications 39 Appendix B Status Flags and Error Codes 43 Examples 46 ...
Page 35: ...Operation 25 ...
Page 36: ...26 Chapter 3 This page intentionally left blank ...
Page 44: ...34 Chapter 4 This page intentionally left blank ...
Page 48: ...38 Chapter 5 This page intentionally left blank ...
Page 52: ...42 Appendix A This page intentionally left blank ...
Page 57: ......