AV15 INSTALLATION MANUAL | TruSteel AutoVap15 Installation Instructions | v. 1.3
4 / 43
FACILITY LAYOUT
This layout diagram is only a suggestion to how a facility could lay out. The customer is
responsible for consulting with their local fire marshal in order to ensure code
compliance. TruSteel is not responsible for setting up the customer facility in order to
comply with any local codes.
The AutoVap15 is C1D2 compliant. The ancillary, however, is not and should be placed outside
of the solvent recovery room.
The chiller unit should be placed in a well ventilated area, preferably outside of the facility in the
open air (on a concrete slab or on the roof).
The chiller should be within 50 feet of the AutoVap15 unit in order to be most efficient.
Summary of Contents for AV15
Page 21: ...AV15 INSTALLATION MANUAL TruSteel AutoVap15 Installation Instructions v 1 3 21 43 ...
Page 26: ...AV15 INSTALLATION MANUAL TruSteel AutoVap15 Installation Instructions v 1 3 26 43 ASSEMBLY ...
Page 42: ...AV15 INSTALLATION MANUAL TruSteel AutoVap15 Installation Instructions v 1 3 42 43 ...