6
Route the power cable and control panel cable to the connec-
tion point (lengthen the mains cable with the provided Wago
clamps if necessary).
If the lighting of the air distributor is also going to be
optionally operated using 12 V, the 12 V adapter that is
available as an accessory must now be connected. The instal-
lation instructions are provided with the 12 V adapter.
FRONT
Fig. 17
Securing the appliance
Screw the two brackets (marked with an arrow in the direction
of travel) to the appliance using the 4 provided M6 x 70 screws
(with screw sealant).
Torque 1.8 Nm
If the roof is more than 50 mm thick, M6 screws
(length = roof thi 30 mm) with tensile strength of 8.8
must be used. The screws must be secured with low-strength
screw sealant (e.g. Loctite).
1.8 Nm
Fig. 18
Preparation for power cable connection and
control panel cable
Provide the lead-through to the connection point for the
mains cable and control panel cable, e.g. in the false ceiling.
FRONT
Fig. 15
Move the appliance to the roof in a horizontal position and
insert into cut-out. The arrow should point in the direction of
travel.
Fig. 16
Do not apply additional sealant between the air condi-
tioning system and the roof.
If the appliance has been turned over or is not horizon-
tal, you must wait for 2 hours before switching on the
device.
Push device forwards in cut-out as far as it will go.
Remove protective film from the appliance.
Summary of Contents for Aventa compact plus AU
Page 1: ...Installation instructions Aventa compact plus AU...
Page 9: ......
Page 10: ......
Page 11: ......