2
TRUE RESIDENTIAL
®
INS TALL ATION CHECKLIS T
To ensure a proper installation, this checklist should be completed to ensure that no part of the
process has been overlooked.
Have all packaging materials been removed?
Have the anti-tip brackets been installed securely and are they properly engaging the unit?
Is the unit leveled properly with all leveling legs making contact with the floor? Has the toe kick
been installed?
Has door stop been installed (if needed)?
Are panels attached securely and properly aligned? (Overlay cabinets only).
Does the customer understand the unit’s operation?
Has the customer been given the key and literature package?
Have stainless steel surfaces been inspected for any imperfections? This is to be done by the
authorized True dealer or installer with the customer, upon completion of installation. Stainless
steel doors, handles and shelves are covered by a limited 30-day warranty for cosmetic defects.
Is the unit operating properly? If not, is the unit plugged in? Is the control turned on?
Summary of Contents for TRUE RESIDENTIAL TBC-24-L-OG-B
Page 2: ...THANK YOU FOR YOUR PURCHASE ...
Page 29: ...27 15 INCH 24 INCH INSTALL GUIDE Back of drawer 8 7 6 24 INCH DRAWER OVERLAY PANEL ...
Page 57: ...55 15 INCH 24 INCH INSTALL GUIDE NOTES ...
Page 64: ...62 TRUE RESIDENTIAL S h e l v i n g A d j u s t m e n t 52 53 PRESERVE THE MOMENT ...
Page 66: ...64 TRUE RESIDENTIAL S t a c k i n g K i t I n s t r u c t i o n s 54 60 PRESERVE THE MOMENT ...
Page 80: ...78 TRUE RESIDENTIAL NOTES ...
Page 81: ...79 15 INCH 24 INCH INSTALL GUIDE NOTES ...
Page 82: ...80 TRUE RESIDENTIAL LINE NOTES ...
Page 83: ......