![True TBB-1-S Installation Manual Download Page 14](http://html.mh-extra.com/html/true/tbb-1-s/tbb-1-s_installation-manual_1174084014.webp)
............ www.truemfg.com ............
True Food Service Equipment, Inc.
12
12
TERMS:
Cut-out - Temperature sensed by the
controller that shuts the compressor
off.
Cut-in - Temperature sensed by the
controller that turns the compressor
on.
REQUIRED TOOLS
•
Phillips Head Screwdriver
•
5/64" or 2 mm Allen Wrench
•
T-7 Torx Wrench
STEP 1
Unplug the cooler.
STEP 2
Remove the screws that secure the
temperature control to the inset box.
STEP 3
Pull out gently from cabinet.
STEP 4
For high elevation installations, it
may be necessary to "warm-up" the
set points. To make the adjustment,
insert the appropriate tool in each
adjustment screw and turn 1/4 of a
revolution clockwise (to the right).
This procedure will adjust both
the cut-in and cut-out about 2°F
warmer.
STEP 5
Make sure to reconnect the pink
wire to the proper spade terminal
when reinstalling.
NOTE:
Mechanical temperature
controllers are affected when
functioning at high altitude. The
cut-in and cut-out
temperatures will be colder than
when the controller functions
closer to sea level
Danfoss Temperature Control (High Altitude Adjustment Only!)
Cut-out Adjustment Screw Allen (5/64"
or 2 mm) (clockwise for warmer)
Cut-in Adjustment Screw Torx (T-7)
(clockwise for warmer)
Compressor Connection (pink)
Compressor Connection (pink)
TEMPERATURE CONTROL ADJUSTMENT FOR
HIGH ALTITUDE ONLY!
INSTALLATION / OPERATION INSTRUCTIONS