
S
TEP
5: I
NSTALL
THE
L
OW
P
ULLEY
C
ABLE
1. Shown on this page is the general
routing of the Low Pulley cable (P13-
0169). The following pages show
sections in greater detail.
2. The cable will be pre-installed into
the chest press station but will need
to be routed through the upright and
out the Low Pulley.
The Low Pulley station
will be installed in the
following pages.
Attach cable end
piece after cable
has been routed.
This section of
cable is pre-
assembled.
P13-0169
Strength
Strength
MP
MP 33.0
.0,, 33.5
.5, & 4.0
, & 4.0
TTrrue Fi
ue Fittnnes
ess T
s Teecchn
hnoolog
logy • O
y • O’’FFaalllo
lon, M
n, MO • P
O • Phhoonne: 800-426-6570/636-272-7100 • T
e: 800-426-6570/636-272-7100 • Trr
uefi
uefi
ttnnes
ess.co
s.com
m
Page # 24 of 64