............ www.truemfg.com ............
True Food Service Equipment, Inc.
7
7
INSTALLATION / OPERATION INSTRUCTIONS
Step 4
Securing Castors and Legs
4OOBTAINMAXIMUMSTRENGTHANDSTABILITYOFTHE
UNITITISIMPORTANTTHATYOUMAKESUREEACHCASTOR
ISSECURE,EGSAREHANDTIGHTENEDSECURELYAGAINST
THELOWERRAILASSEMBLYSEEIMAGE4HEBEARING
RACEONTHECASTOROFTHETOPEDGEOFTHELEGMUST
MAKEFIRMCONTACTWITHTHERAIL
Unit leveling
Four leveling shims have been provided for leveling
castored units positioned on uneven floors. Shims
must be positioned between rail end and bearing
race.
A.
4URNTHEBEARINGRACECOUNTERCLOCKWISEUNTIL
THECABINETISLEVEL,EVELFRONTTOBACKANDSIDETO
SIDEDIAGONALLY
B.
)NSTALLTHEDESIREDNUMBEROFSHIMSMAKINGSURE
THESLOTOFTHESHIMISINCONTACTWITHTHETHREADED
STEMOFTHECASTOR3EEIMAGE
C.
)FMORETHANONESHIMISUSEDTURNTHESLOTATA
ANGLESOTHEYARENOTINLINE
D.
4URNTHEBEARINGRACECLOCKWISETOTIGHTEN
ANDSECURETHECASTORBYTIGHTENINGTHEANCHORING
BOLTWITHAINCHOPENENDWRENCHORTHETOOL
PROVIDED3EEIMAGE
CAUTION
To avoid damage to lower rail assembly, slowly raise
unit to upright position.
.OTE/PENHOLESLOCATEDONTHECROSSMEMBERSOF
THEFRAMERAILSHOULDBEPLUGGEDBEFOREUNITISIN
USE
INSTALLATION OF OPTIONAL LEGS / CASTORS
Important Safeguard for installation of leg/castor (Images 1-5 demonstrate procedure)
1
2
3
4
5
Thread castor into the
underside of cabinet frame
For leveling, insert the
shim between the castor
and frame rail.
Use the tool provided to
tighten the castor into
place.
Thread leg into cabinet
bottom frame rail.
The end of the leg
is adjustable to easy
leveling.
Rail End
Lower Rail
Assembly
Snug Fit
Here
Leveling Shim
Castor
Leg
Bearing
Race
Lower Rail Assembly
Snug Fit
Here
Rail End