![Tru-Weld TWP-2 Operation Manual Download Page 15](http://html1.mh-extra.com/html/tru-weld/twp-2/twp-2_operation-manual_1173882015.webp)
14
READY
FOR
WELDING
When
you
have
completed
all
of
the
previous
steps
to
prepare
for
welding,
including
connecting
the
stud
gun
and
ground
cables
to
the
unit,
attaching
the
ground
cable(s)
to
the
work
area,
setting
up
and
adjusting
the
stud
gun
for
the
selected
stud
diame
‐
ter
and
material,
you
can
now
power
on
the
welder.
The
controller
ON/OFF
switch
is
located
on
the
rear
of
the
unit
in
the
upper
right
hand
corner.
Below
this
switch
is
the
15amp
circuit
breaker
for
the
system.
VOLTAGE
SELECTION
•
Selecting
the
required
weld
voltage
is
achieved
by
turning
the
selector
knob.
The
voltage
range
is
from
35VDC
to
110VDC.
•
The
voltage
is
determined
by
the
diameter
of
the
stud
and
the
base
material.
The
unit
is
labeled
with
recommended
voltage
settings
for
various
applications.
•
Fine
tuning
the
voltage
to
meet
your
requirement
for
your
specific
application
is
recommended.
SET-UP AND WELDING
ON/OFF
SWITCH
15amp
Circuit
Breaker
Voltage
Selector
LED
Display