![Tru-Test MP1010 Quick Start Manual Download Page 2](http://html1.mh-extra.com/html/tru-test/mp1010/mp1010_quick-start-manual_1173792002.webp)
M
P Ser
ies
L
oa
d B
ars
Q
ui
ck
sta
rt G
ui
de
2
3
Getting around
4
Installing MP load bars
1. Choose the location for the load bars and platform. Select a firm and level site free of any obstacles, with space
around the platform or crate to avoid binding. A concrete pad is ideal.
2. Bolt the platform or crate to the load bars using the four M10 x 40 bolts supplied.
3. We recommend that you anchor the platform or crate in place to stop movement. However, in non-permanent
applications, you can use without anchoring, but during use, pay careful attention to any movement.
Caution!
-
Dropping the load bars can cause damage.
-
Do not weld the platform or crate while the load bars are attached.
Bolts
10 mm thread
4 places
Load bar