Technical Drawing:
Norms Applied:
-
CE marked as per 73/23 CEE y 89/336 CEE.
-
UNE-EN 60598-2-22
-
UNE-EN 60598-1
-
UNE-EN 1838
Installation:
-
Place the 2 polycarbonate pictograms (one per side) and fix them to the metacrilate diffuser
by the means of 4 plastic screws included.(see the fig)
-
Install the luminary as required (wall, or ceiling) as indicated in the fig.
-
Make the connections of the supply, hiding the cable in the gap in the upper as indicated in
the fig.
-
Switch On the Power and verify that the Pictograms and the green led indicating the
battering charging are illuminated.
-
The Luminary will not respond to its complete autonomy until 24 hours, as the batteries are
supplied Discharged
Maintenance
:
-The Batteries should be changed once their duration gets inferior to the assigned.)
-The Batteries and the electronic components should be re-cycled or eliminated in an adequate
way.
-Before doing any maintenance operation, please make sure that the Main supply is switched
off and the luminary is in STAND BY Position.
-To change the battery, remove the cover, disconnect & remove the battery accordingly, as
indicated in the fig.