Product overview

Fig. 1: Schematic illustration DID-E2-VC

1

Primary air spigot

2

Terminal box for electrical connection of
volume flow controller (only with version VC)

3

Pressure measurement point (only with ver-
sion VC)

4

Rating plate

5

Water connections, valve with actuator
(optional)

6

Water connections, lockshield (optional)

7

Casing

8

Hanging brackets (4)

9

Extension spigot for supply air (optional)

10

Ventilation grille for supply air (optional)

11

Installation subframe for secondary air grille
(optional)

12

Safety cable for securing the grille

13

Secondary air grille (optional)

14

Heat exchanger

15

Pipe connection for direct valve connection
(optional)

Installation manual

GB/en

Active chilled beams

Type DID-E2

TROX GmbH

Heinrich-Trox-Platz
47504 Neukirchen-Vluyn, Ger-
many
Phone: +49 (0) 2845 2020
Fax: +49 (0) 2845 202265
E-mail: [email protected]
Internet: http://www.trox-
technik.com

A00000075523, 07/2019, 

©

 2019 TROX GmbH

 

Active chilled beams Type DID-E2

1

Summary of Contents for DID-E2 Series

Page 1: ...t for supply air optional 10 Ventilation grille for supply air optional 11 Installation subframe for secondary air grille optional 12 Safety cable for securing the grille 13 Secondary air grille optio...

Page 2: ...ears The manufacturer does not accept any liability for damages resulting from Non compliance with this manual Incorrect use Operation or handling by untrained individuals Unauthorised modifications T...

Page 3: ...ct use Incorrect use of the unit can lead to dangerous situations Never use the unit in areas with potentially explosive atmos pheres in humid rooms in rooms with aggressive or dust laden air Importan...

Page 4: ...ses 6 bar Max operating temperature 75 C 55 C when using flexible connecting hoses Minimum operating temperature 6 C NOTICE Water damage by condensate An undershooting of the dew point temperature cau...

Page 5: ...length LN 1000 x 320 1000 x 512 1125 x 320 1125 x 512 1250 x 320 1250 x 512 DID E2 15 5 20 5 17 0 23 0 19 0 25 0 Supply air spigot Z 1 7 1 7 1 9 1 9 2 1 2 1 Installation subframe ERS 1 4 1 5 1 6 1 7 1...

Page 6: ...0 x 320 1000 x 512 1125 x 320 1125 x 512 1250 x 320 1250 x 512 DID E2 VC 21 5 26 5 24 0 29 5 26 0 32 0 Supply air spigot Z 1 7 1 7 1 9 1 9 2 1 2 1 Installation subframe ERS 1 4 1 5 1 6 1 7 1 8 1 9 Con...

Page 7: ...g 4 Carrying the unit in pairs Use only lifting and transport gear designed for the required load Always secure the load against tip ping and falling Upon delivery carefully remove the packaging and c...

Page 8: ...rk in pairs preferably use a lift DANGER Danger of death from the fall of a suspended unit Only use fixing materials designed for the required load Use all hanging brackets supplied Stand clear of sus...

Page 9: ...d provided by others 3 Suspension provided by others 4 Installation subframe for secondary air grille optional Assembly of the installation subframe optional Create an assembly opening in accordance w...

Page 10: ...uspension provided by others 4 Air intake through open shadow gaps Connecting the water pipes CAUTION Hot surface Danger of burn or scald injuries when working on the hot water system Before working o...

Page 11: ...with a spanner NOTICE Subzero temperatures will damage the heat exchanger Only fill the heat exchanger if there is no danger of freezing 3 Fill the heat exchanger and vent it To fill the system use c...

Page 12: ...terminal box Fig 1 2 24 V supply voltage only via safety trans former Terminal connections No Designation Wire colour Function 1 Black 24 V AC DC supply voltage 2 Red 3 Y White Control signal force s...

Page 13: ...used Cleaning the heat exchanger Personnel Specialist personnel Protective equipment Industrial safety helmet Safety shoes Protective gloves CAUTION Hot surface Danger of burn or scald injuries when w...

Page 14: ...ury from the grille falling Safety cables are provided on the optional installation subframe for securing the grille When adjusting the grille attach the safety cables to the grille If an installation...

Page 15: ...Active chilled beams Type DID E2 15...

Page 16: ...Active chilled beams Type DID E2 16...

Reviews: