8
EN
condenser dryer DH 105 S / DH 115 S
ð
Position the end of the condensation drain hose above a
water drain. For larger distances, a longer hose of the
same type can also be used.
Removing the condensation drain hose
Press the blue ring on the outside of the quick coupling together
and at the same time pull the hose.
Mains connection
A 3/N/PE three-phase socket with clockwise rotating field is
required to connect the device. The device is delivered with a
CEE phase inverter, 32 A, 6 h.
•
Insert the plug into the respective CEE socket.
If the device does not start up automatically and the error
message
E5
appears in the segment display, the rotating field in
the phase inverter must be corrected.
Correct the rotating field in the phase inverter as follows:
1. Pull the plug from the mains socket.
2. Use a suitable flat-head screwdriver.
3. Rotate the element for phase inversion by 180°.
ð
Phases are now inverted.
180°
4. Plug the plug back into the socket.
Operation
•
Avoid open doors and windows.
•
After being switched on, the device operates fully
automatically.
•
The fan runs permanently until the set nominal value is
reached or the device switched off.
Control panel
12
13
14
15
16
17
18
No. Designation
Meaning
12 Segment display
Indication of the selected humidity in
per cent or
CO
for continuous
operation mode (value < 30 %)
(The default value is 60 % RH.)
Display of error codes
13
MEMORY
LED
Illuminated when the current humidity
setting is saved.
14
HUMIDITY UP
button
Increasing the desired relative room
humidity
For deactivating continuous operation
HUMIDITY DOWN
button
Decreasing the desired relative room
humidity
For activating continuous operation
15
ON/OFF
button
For switching the device on and off
16
MEMORY
button
Saves the current humidity setting.
17
DEFROSTING
LED Illuminated when automatic defrosting
is in progress.
18
OPERATION
LED
Illuminated during ongoing operation.