Assembly material specification and quantity
:
basic frame 1pcs
X axis guide
rail parts
20*18*550 1pcs
Print head parts
1pcs
drag chain
plate
1pcs
screws RM4*20
4pcs
Step 3
:
Print head assembly
As shown in the figure, the pulley on the print
head runs through the X axis guide rail and
the slide block moves smoothly without any
clearance
pulley
M4 screws holes positioning
print head
2-M4*20
2-M4*20
60mm
105mm
X axis guide rail
1.Insert the print head into the X-axis guide rail, pay attention to the direction of the M4 screw hole, as
shown in Figure 1.
2. Insert the X-axis rail assembly into the alignment hole of the chassis, and tighten the screw
RM4*20 without locking it, as shown in Figure 2.
3. Move the left and right sliders to confirm that the X-axis rail assembly moves flexibly after locking
the RM4*20 screw.
4. After adjustment, lock the screw of RM5*25 on the Y-axis guide and move the X-axis guide assembly
again. Repeat the adjustment to ensure that the slide is flexible and has no gap after the locking screw.
The skateboard is in line with
the X-axis guide
6
Summary of Contents for X5SA-400-PRO
Page 1: ......
Page 2: ......
Page 22: ...17 5 Interface operation and printing ...
Page 26: ...2 How to use slice software Type setting follow the steps below to complete the setting 21 ...
Page 31: ......
Page 32: ......