5. Connect the electrical connections according to the template shown below:
6. After the connection of the hydraulic lines, pneumatic lines and the
electrical power supply, add 18 to 20 liters hydraulic oil* into the oil tank.
7. Venting of the hydraulic system:
- open all 3 valves (valve G, anticlockwise 2 full turns, valve I and H at
90°)
-
press the „UP“ button to raise the lift to the max. height
- valve I and H have to be closed now!
- then open the venting screws of the main cylinders (at first on the
main platform, then on the sub platform), to vent the hydraulic system
- tighten the venting screws and press the
„DOWN“ button to lower the
lift to its lowest position
- repeat the venting operation until the hydraulic system is completely
vented (about 2-3 repetitions)
*
Hydraulic oil is not included in the scope of delivery
1
3
4
5
PE L1
L2
L3