USER MANUAL TXB30Y, V16.01
page
|
12
Technical changes, misprints and errors are reserved
5. Installation and testing
1. Take out the machine from the packaging and place it on the ground
(intended installation site). Anchor the platforms in the foundation, when
all connections fit properly and the position is finally determined.
2. Connect the hydraulic lines according to the connection diagram.