9
P2
P2
P4
FIGURE 6
FIGURE 7
H6
P9
H6
H6
H6
P12
P12
H6
P10
Corner Braces
This Side
Step 6
Step 7
Screw the Ball Storage Board-Lower
P9
to the Leg
Top End Apron
P2
using screws
H6
into predrilled
holes.
Install leg levelers
P12
to the bottom of each Leg
P3 & P4
.
Attach the Goal Box
P10
to the Leg Top End
Apron
P2
with screws
H6
using the predrilled holes.
Tighten, but do not strip out screws H6.
Note: Be careful to orientate parts exactly
the same as the assembly diagrams.
Tighten, but do not strip out screws H6.
Note : Predrilled holes
Note : Predrilled holes
P3
PARTS REQUIRED:
2 pcs -
P9
Ball Storage Board-Lower
18 pcs -
H6
4 x 40mm Phillips Round Head Screw
4 pcs -
P12
Leg Leveler
2 pcs -
P10
Goal Box
Important Note :
Please double check and
attach P10 to Leg Assembly
exactly as per diagram.
Note: Align all 4 holes
to install H6 Screws