QUARTZ SLEEVE:

Installation of the Quartz Sleeve:

Always handle quartz sleeves carefully to prevent breaking or chipping.  The quartz sleeves are to be 
clean and free of fingerprints before installing.  

Remove the compression nut.  Install the quartz sleeve through the stainless steel threaded nipple 
allowing an equal amount to extend beyond each nipple.  Install the O-Ring down the top of the  
nipple.  Avoid riding the  O-Ring on any threaded part of the nipple.  Hand-tighten each compression 
nut to form a compression seal around the quartz sleeve.  

Avoid overtightening 

the nuts, which may 

cause a fracture on the end of the quartz sleeve.  Under normal operation conditions, hand-tightening 
will provide a 100 psi seal.  Do not use any devices to tighten end nuts.  Repeat this procedure at the 
opposite end of the chamber.

After you have tightened the compression nut and all other plumbing connections, open the outlet valve.  
Slowly open the inlet valve and flush out all remaining air.  Then close the outlet valve and 

 

slowly open the inlet valve fully.  Check the unit for leaks.  If you find a leak at the compression nut, 
tighten the nut further.  If the leak continues, drain the unit and inspect the quartz O-Ring and  quartz 
sleeve for proper seal.  Once you complete checking the unit, reassemble O-Ring and tighten gland nut.  
Repressurize the unit and check again.

REQUIREMENTS FOR CLEANING THE QUARTZ SLEEVE:

As water passes through the U.V., minerals, debris and other matter in the water may deposit onto the 
quartz sleeve.  After sufficient film has formed on the quartz sleeve, the ability of the ultraviolet  
germicidal rays to pass though the quartz sleeve and into the water may be impaired.  Therefore, it is 
necessary to determine a cleaning schedule for the quartz sleeve.  The frequency will depend on the  
specific type of water conditions.  If the water has been processed through deionization, reverse 

 

osmosis, or is distilled, cleaning may be required only once per year.  If untreated water is used, the 
cleaning frequency will vary.  A minimum of once yearly is standard recommendation for cleaning and 
lamp replacement.  Contact your local dealer for scheduling this service.  Your specific situation will 
vary the frequency time according to the water quality of the home or facility application. 

QUARTZ SLEEVE CLEANING PROCEDURES:

To clean the quartz sleeve, turn off the water flow to the disinfection unit, turn power off, and at a 
separate faucet or valve relieve the water pressure from the UV. Then disconnect the electrical service 
to the lamp pins.  Carefully remove the U.V. lamp.  Loosen the end nut with O-Ring and remove the 
quartz sleeve.  The quartz sleeve may then be washed with a mild soap and hot water solution and rinsed 
clean with hot water.  Should this be insufficient to clean the quartz sleeve, a mild acid may be used (i.e. 
vinegar).  Be certain to follow all recommended safety and handling procedures on the acid container.  
It is important to handle the quartz sleeve with care to prevent breakage.  Make certain that all finger 
prints are wiped clean before reinstalling (see installation of the quartz sleeve).  Replace O-Rings 
[ATS8-544(1)] every time a quartz sleeve is cleaned or replaced. 

Summary of Contents for Neptune TRI Series

Page 1: ...on Systems Model TRI 8 TRI 12 TRI 20 It is important that those responsible for the installation of this equipment as well as the owner operator read this manual and carefully follow the instructions...

Page 2: ...nded or sold by the manufacturer distributor may cause an unsafe condition 7 Intended for indoor use Do not install this disinfection system where it will be exposed to the weather Do not store this d...

Page 3: ...on equipment may be required if these parameters cannot be maintained Flow rate must not exceed rated capacity of the unit DESCRIPTION OF EQUIPMENT The Triton series has an unique design with an ultra...

Page 4: ...always be properly grounded INSTALLATION The Triton series are always placed after the pressure tank and any other type of treatment devices i e softeners filters These units are normally installed in...

Page 5: ...selected Simply hand press or slightly tap in the flow control until it sits on the inside ledge of the machined port 3 Using the mounting box provided secure unit to wall or other surface Make sure t...

Page 6: ...6...

Page 7: ...is operational 4 Set the 1 Year Lamp Timer WITH NEW UV LAMP Make sure the control box is plugged into the wall outlet and the UV lamp is on Press and hold the reset button Hold the reset button down f...

Page 8: ...8...

Page 9: ...the quartz sleeve After sufficient film has formed on the quartz sleeve the ability of the ultraviolet germicidal rays to pass though the quartz sleeve and into the water may be impaired Therefore it...

Page 10: ...V to effectively kill bacteria Failure to replace the U V lamps every 9 000 hours may cause bacteriological breakthrough Should the use of the disinfection unit be intermittent in no case should the...

Page 11: ...to determine how much chlorine solution should be used In some instances removing the seal to measure the water can be a difficult task and it is easier to guess at the quantity of disinfectant needed...

Page 12: ...w to protect wells and springs and keep them from becoming contaminated call or visit your local Cooperative Extension office or your nearest certified water treatment specialist TABLE 1 Quantity of s...

Page 13: ...Water System Using Well Sanitizer Pellets Table 1 Well Diameter Inches Weight of Pellets lbs oz Cups of Pellets Number of Pellets To produce a 400 P P M chlorine dosage NOTE Pellets Weight 1 14 gram e...

Page 14: ...n water back down the well this also rinses upper portion of well After about 15 minutes of recirculation the water a strong chlorine odor should be apparent Turn off hose 6 Bypass water softener and...

Page 15: ...gulator or above 120 volts Line cord disconnected Check replace or outlet defective Defective U V lamp Replace Defective lamp ballast Check output voltage Replace ballast Loose open circuit wire Trace...

Page 16: ...ibutor freight paid It is the dealer customer responsibility to reinstall any components which require replacement under warranty No labor will be covered under this Limited Warranty Neptune U V Disin...

Page 17: ...pe Size Overall Dimensions Shipping GPM 120V 120V L x W x D Weight TRI 8 8 1 0 03 0 25 3 4 MIP 21 x 3 5 x 3 5 9 Lbs TRI 12 12 1 0 03 0 25 3 4 MIP 32 x 3 5 x 3 5 18 Lbs TRI 20 20 1 0 03 0 25 1 MIP 35 x...

Page 18: ...bottle or sterile container being used Holding the cap in a down position the operator should then hold his breath while taking the sample so as to avoid oral contamination of the sample The operator...

Page 19: ...19 WIRING DIAGRAM...

Page 20: ...20 7 7 5 1 2 5 5 1 67 03 21752 2 5 5 5 2 0 3 8 0 287 7...

Page 21: ...21 DRAWING AND PART NUMBERS...

Page 22: ...ort Nut 1 7 WTA 268 Top Mounting Bracket 1 8 WTA5 410 Lock Nut 1 9 WTA8 544 End Nut O Ring seal quartz sleeve 1 10 WTA5 409 Brass End Nut 1 11 WTA8 546 O Ring for shroud on end nut 1 12 WTA 7091 Gayno...

Page 23: ...Port Nut 1 7 WTA 268 Top Mounting Bracket 1 8 WTA5 410 Lock Nut 1 9 WTA8 544 End Nut O Ring seal quartz sleeve 1 10 WTA5 409 Brass End Nut 1 11 WTA8 546 O Ring for shroud on end nut 1 12 WTA 7091 Gayn...

Page 24: ...TA5 410 Lock Nut 1 7 WTA8 544 End Nut O Ring seal quartz sleeve 1 8 WTA5 409 Brass End Nut 1 9 WTA8 546 O Ring for shroud on end nut 1 10 WTA 7091 Gaynor Connector 1 11 HS4 075 BK Shrink Tubing 167 12...

Page 25: ...0 12 3 57 180 5 6 5 37 21 47 76 2 76 RQWURO RDUG R URQW 76 76 RQWURO RDUG 76 RUNKRUVH DOODVW 76 0 1 ORQ 6WDQGRII 76 2 76 RQWURO RDUG R DFN 2XWOHW 76 0 RYHU 6FUHZV 76 6WUDLQ 5HOLHI 76 OHFWULFDO 3OXJ 7...

Page 26: ...26 NOTES...

Page 27: ...27 NOTES...

Page 28: ......

Reviews: