background image

Contents

1

 -Base 

(2 Pcs.)

1 -Base 

(2 Pcs.)

-Post 

(4 Pcs.)

2 -Post 

(4 Pcs.)

3

 -Side lower members  

(4 Pcs.)

3 -Side lower members  

(4 Pcs.)

-Center lower members 

 

(2 Pcs.)

4 -Center lower members 

 

(2 Pcs.)

-Side upper members  

(4 Pcs.) 

5 -Side upper members  

(4 Pcs.) 

-Center upper members 

(2 Pcs.)

6 -Center upper members 

(2 Pcs.)

7- 

Top support 

 bracket 

(2 Pcs.)

7- Top support  bracket 

(2 Pcs.)

3/8¨-16 UNF hex nut 

(32 Pcs.)

3/8¨-16 UNF hex nut 

(32 Pcs.)

 3/8¨X 7/8¨ Spring washer 

(32 Pcs.)

 3/8¨X 7/8¨ Spring washer 

(32 Pcs.)

            *  

Equipment Hardware

                12-24 X 5/8”Cilindrycal head  screw (56 Pcs.)

                PVC black flat washer (56 Pcs.)

                12-24X5/8” Conical screw washer (56 Pcs.)

                 PVC White flat washer (56 Pcs.)

                 

Cable manager hooks...

                 (32 Pcs w/mounting fasteners)

12-24 x 5/8 Screw (56 Pcs.)

                 

Assemble Base & Posts

 

* Place base  on a hard flat surface. Use 3/8¨

Screws to attach base to each post  

Assemble top support bracket

* Verify alignment  

Pre-Assemble upper and lower 

side memebers

* Set desired depth 

    Use 3/8¨Screws and tighten members

Install Cable Manager Hooks as desired

* Use included  plastic fasteners 

3/8¨-16x1¨UNF screw 

(32 Pcs.)

3/8¨-16x1¨UNF screw 

(32 Pcs.)

Required Tools

Assembly hardware

9/16¨ Wrench

9/16¨ Wrench

9/16¨ Socket, Ratchet

9/16¨ Socket, Ratchet

MODEL: SR4POST 

ADJUSTABLE OPEN RACK 

24 

24 

Assembly Instructions

Install Pre-Assembled upper 

side members as shown

*Use included nuts .Fasten tightly

Install Pre-Assembled lower side

members as shown

* Verify  alignment before tightening 

2A.  repeat for rear side

1A.  repeat for rear side

1111 W. 35th St,  Chicago, IL 60609 

(773) 869-1234 www.tripplite.com 

Reviews: