6
SSS Ultron 18BA
OPERATOR MANUAL
uncRatInG macHIne
Be sure and check packing carton for any damage.
Immediately report any damage to carrier. Check
the contents of package to ensure that the
following items are included:
•
Machine
•
Requires 2-12V Batteries
•
Squeegee assembly
•
Battery Charger
•
Pad Driver or Brush
InStallInG BatteRIeS
the batteries are already in the machine upon
delivery; However you will need to connect the
cables to the battery posts.
WaRnInG: Batteries emit hydrogen gas.
Explosion or fire can result from hydrogen
gas. Keep sparks and open flames away! Keep
battery compartment open when charging.
1. Turn off the machine.
2. Lift the Recovery tank (see machine
components, P5 item #2) to access the battery
compartment.
3. Carefully place the two batteries into the
compartment as shown in figure below.
do not dRop BatteRIeS Into
compaRtment!
4. Connect battery cables to posts as shown in
drawing below.
Red to poSItIVe and BlacK to neGatIVe.
macHIne Set up
pRe-opeRatIon cHecKS
1. Sweep or dust mop the surface to be cleaned.
2. Check battery meter to make sure batteries are
fully charged. (See BATTERY CHARGING).
3. Check that squeegee is properly installed.
4. Check that brush / pad is properly installed.
InStallInG pad dRIVeR oR BRuSH
1. Ensure that the machine is turned off.
2. Lift the Squeegee lift lever (see machine
components, P5 item #12) to the upward
postion.
3. Lift the Scrub head (see machine components,
P5 item # 23) by pushing down the Control
handle bar (see machine components, item
4), while the Rear parking wheel (see mahcine
components, P5 item #15 ) will touch the floor.
4.
If using a Pad Driver, first attach the appropriate
pad to the pad driver surface.
5. Turn the brush motor hub until the slot with the
spring clip is visible through the scrub head
window.
6. Mount the pad driver or brush to the brush
motor hub by lining up the three studs with the
three holes in the brush motor hub. Once in the
holes, rotate the driver toward the spring clip to
lock the pad driver into place.
If necessary, press down on the Motor hub lock
pin (see machine componts, P5 item # 25) to
lock motor hub in place.
mountInG tHe SQueeGee aSSemBly
1. Lift the Squeegee lift lever to the upward
position.
2. Mount the Squeegee assembly (see machine
components, P5 item #14) to the squeegee
pivot bracket. Make sure the knobs are
completely seated into the slots before securing
knobs.
3. Connect the vacuum hose to the squeegee
assembly. Loop the hose by using the hose clip
provided.
4. Check the squeegee blades for proper
adjustment.
macHIne Set up & InStallatIon
Summary of Contents for Ultron 18BA
Page 12: ...12 SSS Ultron 18BA PARTS LIST RECOVERY TANK GROUP...
Page 14: ...14 SSS Ultron 18BA PARTS LIST SOLUTION TANK GROUP...
Page 17: ...SSS Ultron 18BA 17 PARTS LIST CONTROL CONSOLE GROUP...
Page 20: ...20 SSS Ultron 18BA PARTS LIST SCRUB HEAD GROUP...
Page 23: ...SSS Ultron 18BA 23 PARTS LIST SQUEEGEE GROUP...
Page 25: ...SSS Ultron 18BA 25 PARTS LIST SOLUTION FLOW GROUP...