background image

 

 
 
 

 

14

Summary of Contents for Air Boss T1001 Module

Page 1: ... Module T2002 Module T1300 T2600 INSTALLATION OPERATION SERVICE Electrostatic Precipitators for Commercial Industrial Applications 101 McNeill Road Sanford NC 27330 919 775 2201 Fax 919 777 6399 800 884 0002 www trioninc com T NO 149869 001 MANUAL PAR June 2004 4 ...

Page 2: ...s 4 Unit Operation 4 Ducting Application 5 Liquid Aerosol Installation 5 Electrical Installation 6 Cleaning 6 Inspections 7 VI W T1001 T2002 7 T1300 T2600 7 Troubleshooting Diagram 8 Figure 1 T1300 Unit 9 Figure 2 T2600 Unit 10 Figure 3 T1001 Unit 11 Figure 4 T2002 Unit 12 Figure 5 Enclosure Assembly 13 Figure 6 Blower Assembly 14 Figure 7 Blower Assembly Bill of Material 15 Figure 8 Ionizer Colle...

Page 3: ...1300A 230V 60 HZ 1 PH 3 4 5 6 T1300B 230V 60 HZ 3 PH 1 3 6 T1300C 460V 60 HZ 3 PH 1 1 8 T1300D 575V 60 HZ 3 PH 1 1 6 T1300E 230V 50 HZ 1 PH 3 4 5 9 T1300N 208V 60 HZ 3 PH 1 3 6 T2600 120V 60 HZ 1 PH 3 4 11 3 T2600A 230V 60 HZ 1 PH 3 4 5 7 T2600B 230V 60 HZ 3 PH 1 3 7 T2600B 230V 60 HZ 3 PH 2 6 5 T2600C 460V 60 HZ 3 PH 1 1 9 T2600C 460V 60 HZ 3 PH 2 3 3 T2600D 575V 60 HZ 3 PH 1 1 7 T2600E 230V 50 H...

Page 4: ...ollector designed to remove up to 95 of the dust smoke liquid aerosol and other pollutants from the air passing through it HOW IT OPERATES Polluted air is drawn into the unit by the belt driven blower on a T1300 or T2600 unit The T1001 and T2002 units require an external air handler to move the air After passing through a pre filter the particles in the air are given an electrical charge supplied ...

Page 5: ...READ THOROUGHLY 1 Carefully unpack unit from shipping crate or carton and examine for damage in shipment 2 Remove ionizer collector cell s pre filters and after filters 3 Attach 500 pound 227 kg test chain to the ceiling joist using a Wood joist 3 8 m10 eye bolts b Metal joist wrap chain around joist at least twice and secure with 500 pound 227 kg test connecting link 4 Chain should be cut to allo...

Page 6: ...personnel WARNING RISK OF ELECTRIC SHOCK These serving instructions are for use by qualified personnel only To reduce the risk of electric shock do not perform any servicing other than that contained in the operating instructions unless you are qualified to do so SAFETY NOTE Factory designed access to all electrically charged high voltage components contain electrical interlocks for the safety of ...

Page 7: ...xploded views VI WARRANTY All Trion Electronic Air Cleaners are warranted for 3 Year Limited Warranty on units and 1 Year Limited Warranty on replacement parts Labor is NOT included Do not return defective parts without permission from the factory and receiving a material return acceptance number VII TROUBLESHOOTING GUIDE T1001 T2002 Problems and Possible Causes 1 Indicating Light Out a Unit not p...

Page 8: ...9 ...

Page 9: ...10 ...

Page 10: ...11 ...

Page 11: ...12 ...

Page 12: ...13 ...

Page 13: ...14 ...

Page 14: ...Blower Motor Assembly FIG 6 15 ...

Page 15: ...16 ...

Page 16: ...17 ...

Page 17: ...18 ...

Page 18: ...19 ...

Page 19: ...20 ...

Page 20: ...21 ...

Page 21: ...22 ...

Page 22: ... Boscstr 60 No 728 Fuzhou Road D 50171 Kerpen Rm 3002 3005 Germany Raffles City Office Tower Tel 49 0 2237 922 103 Shanghai P R China 200001 Fax 49 0 2237 922 104 Tel 86 21 63403232 Email info trion deutschland de Fax 86 21 63403867 Fedders International Fedders International Inc Air Conditioning 128 Joo Seng Road A 30 Chintels House 05 01 Kalish Colony DP Computers Building New Delhi Singapore 36...

Reviews: